The McDaniel Ln 6028 Project

The McDaniel Ln 6028 project consists of removing and replacing an existing storm drainage network in the Charlotte Hills Mobile Home Park. It currently has a preliminary estimate of 1.2million dollars.

Storm Water Repair and Improvement FY2025 E

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, , and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Storm Water Repair and Improvement FY2025 G

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drainpipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer relocations, installations and adjustments.  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.

Rhodes SDIP

Rhodes SDIP is a minor bid project that was created to address the service request at 3738 Rhodes and is located on the City project dashboard.

The Shade Valley Pond Repairs Project

The Shade Valley Pond Repairs project was initiated in order to relieve the City of significant efforts and costs of ongoing pond maintenance.  Proposed improvements to the pond are intended to address nuisance vegetation, increase storage capacity, address geese issues, and enhance the overall aesthetics of the pond.  Goals are to restore pond to “below normal pool” volumes via dredging of forebay and main pool to increase water quality function and remove available nutrients contributing to duckweed and algal blooms.  The entirety of the pond and littoral shelf will be replanted with wetland plantings and trees to enhance aesthetics and decrease attractiveness of pond to geese. Geese preventative measures are proposed to establish plantings.

 

Morning Dale Storm Drainage Improvement Project

The Morning Dale Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 560 acres, the project will replace and/or rehabilitate aging infrastructure and provide adequate drainage system capacity. This project area is bordered by Hinson Drive to the north, Stratfordshire Drive to the south, Tadlock Place to the east and Morning Dale Road to the west.

Specialized Roadway Construction Services FY25B

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Specialized Roadway Construction Services FY25C

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.