The Project consists of constructing water and/or sanitary sewer service installations at a single address (single applicant) or water and/or sanitary sewer service dismantlement at a single address (single applicant).
McAlpine Creek WWMF – Phase II Paving Improvements
The Project consists of constructing new and replacement asphalt concrete pavement in the areas indicated on Contract Documents along with storm water and chemical containment improvements.
Catawba Pump Station Rehabilitation Project
The Project site is the Catawba Raw Water Pump Station located on Mountain Island Lake, owned & operated by Charlotte Water. The site address is 12548 Pump Station Rd, Charlotte, NC 28216. The work under this project will be primarily in Cells #2 & 3. The electrical work consists of changing the Cell #3 voltage from 2300V to 4160V, including new switchgear, synchronous motor, conduit, cable, etc. as well as re-winding an existing electric pump motor. The civil/mechanical work consists of rebuilding/replacing screens, rehabbing cone valves, and installing a new flow meter vault. The structural work consists of new electrical vault, drywall electrical room, masonry, doors, windows, louvers, and fans. This project also includes upgrades to the fire alarm system for the entire Catawba Pump Station facility.
Tuckaseegee Berryhill Thrift Roundabout
The project will replace the signalized intersection with a roundabout. Project will also provide sidewalks, curb and gutter, driveways, concrete island, wheel chair ramps, retaining wall, storm drainage, asphalt pavement, pavement markings and signage and utility relocation.
Collective Storm Drainage Improvement Projects Series G
This is a collective series storm drainage improvement submittal which contains four (4) separate projects. The projects vary in size and each bring their unique differences. There will be pipe replacement varying in size from 15″- 48″ RCP and 38″x60″ elliptical RCP. Other project replacements include, curb, curb ramp, sidewalk, asphalt, driveways, storm drainage structures and sewer pipe. Project installation includes rip-rap aprons, CIPP liner for a range of pipe from 24″-42″, active shoring, storm drainage pipe and storm drainage structures. Some 24″ RCP will be plugged and filled with excavatable flowable fill.
Eaglewood Storm Drainage Improvement Project
The Eaglewood Storm Drainage Improvement Project will address deficiencies of the storm drainage system located within Eaglewood Avenue right‐of‐way between Pinafore Drive and Pineborough Road. Work includes storm drains, storm drainage structures, sanitary sewer, curb and gutter, asphalt paving, erosion control, traffic control and other related activities.
Sharon Amity Sidewalk Improvements (Tangle Dr. to Craig Ave)
This project will provide sidewalk on the south side of North Sharon Amity from Tangle Drive to Craig Avenue. Project length = 0.32 miles.
Hinsdale- Tinkerbell Storm Drainage Improvement Project
The project area covers approximately 240 acres and includes neighborhoods east of Sharon Rd, south of Wamath Dr, north of Stocktie Rd, and west of the intersection of Hinsdale St and Tinkerbell Ln. Improvements include channel stabilization, replacement of aging/deteriorating culverts, replacement and repair of aging/deteriorating storm drains, select sanitary sewer improvements and other related activities.
Storm Water Repair and Improvement FY2021-C
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.