Two customers submitted this project under slightly different titles. This entry is redundant of the “Ashe Plantation Phase II” project. Please delete this one.
Construction of a new wastewater treatment plant in South Mecklenburg County near Mint Hill. The construction consists of process piping, wastewater equipment installation, and electrical power and controls. The project shall also include provision of a temporary treatment plant during construction of the new plant.
Replacement of diffuser discs in aeration basins 3 and 4. Structural repairs in basins. Baffle installation and mixer rehabilitation.
Roofing Replacement of various Wastewater Treatment Plants’ structures: McDowell, Irwin, Sugar Creek and McAlpine. Replacement consists of complete tear off of existing roof down to substrate. Minor mechanical and electrical relocation/replacement work will be performed, if necessary.
Roofing Replacement of various Water Treatment Plants and Lift Stations. The Project consists of replacing roofing systems at Sharon Repump Station, Hoskins Booster Pump Station, and Plaza Booster Pump Station, as well as removing existing skylight and install clerestory and roof structure at Plaza Booster Pump Station and replacing the skylight at Idlewild Booster Pump Station. complete tear-off of the existing roof down to the substrate. Minor mechanical and electrical relocations and re-hook-ups are required.
The Project is for the construction of an extension of the existing access road at the Long Creek Pump Station for operational connectivity between the proposed Stowe Regional Water Resource Recovery Facility (WRRF) and Long Creek Pump Station (Southern Access Road). The Southern Access Road consists of approximately 650 linear feet of paved roadway with 2-12 feet travel lanes and a three span approximately 235 feet long bridge that accommodates the two travel lanes and a pedestrian/utility corridor lane over Long Creek.
This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.
This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.
This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island, and wheelchair ramps.
This project will construct a pedestrian bridge over I-277 to connect South End to Uptown. The bridge will be located just west of the existing light rail bridge and will include aesthetic elements to create a signature design. It will also include a new pedestrian rail crossing on the Morehead landing area and will tie the Stonewall plaza into the existing light rail platform. The scope includes a new two-span cable stay arch bridge over I-277. The construction work includes grading, storm drainage, retaining walls, abutments, pedestrian bridge, lighting, curb, and concrete multi-use path.