Fuel Line Replacement (Canceled Re-Advertise Later Date)

Replace the fuel lines serving the Bank of America and Wilson Air fuel dispending cabinets from the fuel farm. The work includes a combination of fuel line removal/replacement and piping/dispenser cabinet modifications.  The associated civil site work includes demolition, minor fencing, asphalt pavement milling, pavement removal, asphalt paving, and landscaping.

Project will Re-Advertise at a later date.

Elevated Water Storage Tanks (Cancelled)

This project consists of constructing two new elevated storage tanks. The first tank will be called the Woodlawn Tank with a size of 3 MG (million gallons).    The second tank will be called the Sunset Tank with a size of 2 MG (million gallons). There will be waterline work associated to extend the mainlines to the tank site. The construction site will require grading and clearing in preparation of the tank installation.

Fire Station #35 HVAC Renovation (Re-bid)

This project will renovate the existing HVAC System, Controls and Water heaters for Charlotte Fire Station 35. The scope of work includes removal and disposal of the existing mechanical system ductwork, furnaces, condensers, and dedicated outdoor air unit and installation of new mechanical split system
Dx/Furnaces and air distribution, and reconnect with existing DDC controls.

Terminal Sprinkler and Voice Evacuation Upgrade

The Terminal Sprinkler and Voice Evac Upgrade Project consists of two scopes of work, the sprinkler system upgrades and the voice evacuation system upgrades, which will be awarded separately. The Fire Sprinkler System upgrades entail adding sprinkler coverage to various locations throughout the Terminal building. These include areas throughout the ramp and ticket levels, public and non-public areas, and are all located within the secure portion of the Terminal building. The work will cover approximately 110,000SF of currently non-sprinkled existing space and will include necessary patching and painting of all impacted areas. This scope will primarily be night work, 2300-0500, with some opportunity for day work, 0700-2359.

CMGC Electric Vehicle Charging Stations Project

This project is for the purchase and installation of up to twenty-five electric vehicle charging stations for the Charlotte-Mecklenburg Government Center (CMGC) Parking Deck. Scope includes all electrical infrastructure work including but not limited to electrical panels, conduits, and concrete work.

Electrical Vehicle (EV) Charging Modification

Installation of two new 150KW electrical vehicle (EV) fast chargers and six EV charging station dispensers for the electrical buses at Charlotte Douglas International Airport (CDIA). The work includes, but is not limited to, the required electrical work to install two new 150KW EV chargers and six charging EV dispensers, with each of the EV chargers supporting three dispensers.

McAlpine 54″ Sanitary Sewer Rehabilitation Phase 4

The project consists rehabilitation of approximately 4,784 feet of 8-inch and 8,320 feet of 54-inch sanitary sewer via cured in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning and television inspection, rehabilitation of connecting manholes as specified, bypass pumping of wastewater flows, and complete restoration.