McAlpine Preliminary and Primary Treatment Construction Package #1 – cancelled

Provides for rehabilitation of Preliminary and Primary Treatment Facilities. Facilities generally include headworks, flow equalization basins, primary clarifiers, and gravity thickeners. A facilities evaluation, conducted by the design team, will determine the final scope of work.

this opportunity was archived earlier

McAlpine Preliminary and Primary Treatment Construction Package #1-CANCELLED

Provides for rehabilitation of Preliminary and Primary Treatment Facilities. Facilities generally include headworks, flow equalization basins, primary clarifiers, and gravity thickeners. A facilities evaluation, conducted by the design team, will determine the final scope of work.

Cancelled as of 8/20/2024

FY24 Water/Sewer Infrastructure Construction – Contract 3 -CANCELLED

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

FY24 Water/Sewer Infrastructure Construction – Contract 2-CANCELLED

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

Cancelled 6/25

Fiscal Year 2027 Small Diameter Water and Sewer Services Contract

This contract will provide installation services for small-diameter water and sewer service connections within the Charlotte Water service area. It will replace the existing FY24 Small Service Contract #2. The project ensures continued expansion and maintenance of service connections across the region.

FY24 Small Diameter Water and Sewer Services Contract #2-CANCELLED

This contract is for the continuous installation of small water and sewer services, as needed, for commercial or residential purposes with a diameter of less than one and a half inches. Charlotte Water installed about 1,800 new residential water and sewer taps in the last 12 months. This contract will help meet the demand for these kinds of service connections for the next two years.

cancelled on 3/14/2024

Fiscal Year 2026 Small Diameter Water and Sewer Services Contract

This contract will provide installation services for small-diameter water and sewer service connections within the Charlotte Water service area. It will replace the existing FY24 Small Service Contract #1. The work will help meet growing service demands and maintain system reliability.

Marlwood/Waverly (Dredging) Surface Water Quality Improvement Project

The Marlwood/Waverly project area consists of the two ponds, Marlwood Lake located south of Albemarle Road near Marlwood Circle, and Waverly Lake located north of Albemarle Road near Almond Road. The existing ponds have silted in and project improvements include pond dredging to specified projects depths.

FY24 Water/Sewer Infrastructure Construction – Contract 1

The Project consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution
system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.