Project of approximately 16,000 Linear Feet of 36 inch water main along Albemarle Rd. This project improves the water transmission capacity in the 960 pipe zone. Project is in final design, permitting and easement acquisition.
5/13 cancelled due to project schedule reprioritization.
This construction will improve site conditions at the Zone 3 Field Operation facility. Construction work will include stormwater settling basins, stormwater conveyance, and various site improvements. The design is already complete.
This solicitation will be used for addressing the physical barriers identified in the city’s ADA Transition Plan. Areas include but are not limited to; restrooms, water fountains, signage, handrails/guardrails, doors & hardware, main lobby service area, exterior sidewalks, parking, and striping.
The interior renovation within the CLT Center (Operations Center) to include new office space for a tech help suite, conference room, video editing room, and cell phone tech office. The project consists of approximately 2,500 sf and will be built in two (2) phases.
Provides for rehabilitation of Preliminary and Primary Treatment Facilities. Facilities generally include headworks, flow equalization basins, primary clarifiers, and gravity thickeners. A facilities evaluation, conducted by the design team, will determine the final scope of work.
this opportunity was archived earlier
Provides for rehabilitation of Preliminary and Primary Treatment Facilities. Facilities generally include headworks, flow equalization basins, primary clarifiers, and gravity thickeners. A facilities evaluation, conducted by the design team, will determine the final scope of work.
Cancelled as of 8/20/2024
This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.