Lift Station Improvements Phase 4 – CANCELLED

Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis.

-inactive due to budget reprioritization

Lift Station Improvements Phase III – cancelled

Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis.

This opportunity has been cancelled.

960 East/West Water Main-CANCELLED

Project of approximately 16,000 Linear Feet of 36 inch water main along Albemarle Rd.  This project improves the water transmission capacity in the 960 pipe zone.  Project is in final design, permitting and easement acquisition.

5/13 cancelled due to project schedule reprioritization.

978 Zone Water Transmission Main and Booster Pump Station-CANCELLED

Project consists of a large diameter water transmission main and booster pump station. Request for Qualifications and engineering services design contract for a water transmission main from Franklin Water Treatment Plant to Statesville Avenue and 978 Zone Booster Pump Station (Northeast Water Transmission Project). Preliminary assessment of project alternatives being completed now.

cancelled on 3/15

Zone 3 Stomwater and Site Improvements

This construction will improve site conditions at the Zone 3 Field Operation facility. Construction work will include stormwater settling basins, stormwater conveyance, and various site improvements. The design is already complete.

Old City Hall – ADA Implementation

This solicitation will be used for addressing the physical barriers identified in the city’s ADA Transition Plan. Areas include but are not limited to; restrooms, water fountains, signage, handrails/guardrails, doors & hardware, main lobby service area, exterior sidewalks, parking, and striping.

CLT CENTER PHASE 14 (Construction)

The interior renovation within the CLT Center (Operations Center) to include new office space for a tech help suite, conference room, video editing room, and cell phone tech office. The project consists of approximately 2,500 sf and will be built in two (2) phases.

Elevated Storge Tank #2 – Woodlawn – CANCELLED

Construction of the second elevated storage tank at the Woodlawn site if there is sufficient funding after starting construction on the first elevated storage tank (Sunset Road). The second elevated storage tank has a capacity of three million gallons. The project is fully designed and permitted.

  • inactivate due to budget reprioritization

McAlpine Preliminary and Primary Treatment Construction Package #1 – cancelled

Provides for rehabilitation of Preliminary and Primary Treatment Facilities. Facilities generally include headworks, flow equalization basins, primary clarifiers, and gravity thickeners. A facilities evaluation, conducted by the design team, will determine the final scope of work.

this opportunity was archived earlier