Elevated Storage Tank Engineering Services

The Project consists of designing multiple new elevated storage tanks ranging in size from approximately 1.5 MG to 3.0 MG.  CLTWater intends for the selected Company to provide services for three elevated storage tanks.  The selected firm would also be asked to evaluate the quality of additional existing storage tanks in the CLTWater system.

Mallard Creek Basin Sanitary Sewer Improvements – CANCELLED

CANCEL – This project changed to a phased project with a different title.  It was advertised last year under a different name.

 

This project consists of the design and construction of 22,100 linear feet (LF) of 54″”-84″” pipe to upsize the current Mallard Creek Trunk Sewer line.

Central Energy Plant (Design)

The Central Energy Plant is part of the Terminal Lobby Expansion Construction Management at Risk Project.

Provide for design of space for a new central energy plant to be located on the first level. The central energy plant will be for the New Terminal Expansion, but will also include space for current and future infield development.

Project Management Services

The Charlotte-Douglas International Airport (CLT) is seeking to engage the services of a qualified Aviation Consultant to provide Project Management (PM) Services for various projects. These projects may include, but are not limited to airfield/civil works, passenger handling facilities and other aviation support facilities, such as; Terminal Lobby Expansion, Central Energy Plant, Federal Inspection Station Renovations, , Concourse A Expansion Phase 2, Terminal and Concourse Renovations, Atrium and Terminal Life Safety
Enhancements, E Concourse Expansion Phase 9, Tenant (Concession and Retail) Renovations, and new runway and taxiways and associated work, major utility infrastructure work, roads and bridges, airfield lighting and Navigation Aids, fire stations, and cargo and catering building improvements.