aviation-bluet  Aviation / Architectural / Engineering Services

South Ramp Expansion Program Phases 1 and 2

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-02-24 2025-02-24 South Ramp Expansion Program Phases 1 and 2

The South Ramp Expansion Program (SR Expansion Program or Program) for Charlotte Douglas International Airport (CLT or the Airport) consists of the design and construction of a three-phase program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. Phase 1 of the South Ramp Expansion Program will provide unimpeded dual ADG III and V taxilanes for the southeast area. Phase 2 of the Program will provide continuity of the unimpeded dual ADG III and V taxilanes for the center area of the ramp. The Program also provides for the relocation of the Airport Surveillance Radar (ASR) and the Center Lighting Vault. Finally, Phase 3 will complete the linear and unimpeded taxilane connectivity for the southwest corner of the terminal ramp.

The SR Expansion Program currently consists of five separate construction projects, three airfield and two enabling facility relocations, as identified in the list below. This RFQ will be used to select a Firm to provide the design services and construction administration for South Ramp Expansion Phase 1/East and South Ramp Expansion Phase 2/Center.

Posting Number 02 2025-Q1(Jan-Mar)-AVI-15154

Anticipated Posting Date 2025-02-24

Commodity Code(s): 90654, 90692, 90903, 92508, 95885

Solicitation Link: https://www.charlottenc.gov/Growth-and-Development/Doing-Business/Contract-Opportunities/SR-Exp-Ph1-2

The South Ramp Expansion Program (SR Expansion Program or Program) for Charlotte Douglas International Airport (CLT or the Airport) consists of the design and construction of a three-phase program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. Phase 1 of the South Ramp Expansion Program will provide unimpeded dual ADG III and V taxilanes for the southeast area. Phase 2 of the Program will provide continuity of the unimpeded dual ADG III and V taxilanes for the center area of the ramp. The Program also provides for the relocation of the Airport Surveillance Radar (ASR) and the Center Lighting Vault. Finally, Phase 3 will complete the linear and unimpeded taxilane connectivity for the southwest corner of the terminal ramp.

The SR Expansion Program currently consists of five separate construction projects, three airfield and two enabling facility relocations, as identified in the list below. This RFQ will be used to select a Firm to provide the design services and construction administration for South Ramp Expansion Phase 1/East and South Ramp Expansion Phase 2/Center.

Requirements

Last Updated: 02/24/25
Insurance Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Ryan Lingholm

Procurement Officer

Ryan.Lingholm@ci.charlotte.nc.us