engineering-property-management-bluet  Department of General Services / Construction

Cross Charlotte Trail (XCLT)− Matheson to Craighead

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-03-22 2025-03-22 Cross Charlotte Trail (XCLT)− Matheson to Craighead

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

Posting Number 03 2025-Q1(Jan-Mar)-DGS-14020

Anticipated Posting Date 2025-03-22

Commodity Code(s): 55078, 91200, 91223, 91319, 91347, 91361, 91396, 91430, 91479, 96239

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

Requirements

Last Updated: 03/20/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Mackenzie Winebrenner

City Contact

980.214.7291

Mackenzie.Winebrenner@charlottenc.gov