engineering-property-management-bluet  Department of General Services / Construction

CMPD Northwest Division Police Station (Re-Bid)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 02 2024-Q1(Jan-Mar)-DGS-14028

Anticipated Posting Date 2024-02-16

Commodity Code(s): 91200

Solicitation Link: https://charlottenc.bonfirehub.com/projects/123174/details

The Project is the Charlotte Mecklenburg Police Department’s Northwest Division The building site is located at 1800 Mt Holly-Huntersville Rd., Charlotte, NC 28214. The Project consists of a new 16,000 square foot, single story facility.

The scope includes, but is not limited to, the following:
a. Improvements to Mt Holly-Huntersville Road
b. New driveway connections to Mt Holly-Huntersville Road, a visitor parking area and a gated/fenced in, staff/fleet parking area with underground piping to a storm water pond.
c. An open air canopy for consisting of a pre-engineered, metal building structure with standing seam metal roof system.
d. Electric Vehicle (EV) Service Equipment (EV charging station system).
e. A ground mounted, 249kWh/year, 208V, 3-phase Photo-Voltaic (PV) solar array collector system.
f. A Geothermal well field system with a packaged pump skid.

Requirements

Last Updated: 02/20/24
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Landon Brunson

City Contact

landon.brunson@charlottenc.gov