Baggage Handling System Control Room Relocation

Details

Print Download
Add to Calendar 2026-04-01 2026-04-01 Baggage Handling System Control Room Relocation

The project involves the interior upfit of approximately 2,000 square feet of existing shell space on the baggage level of the main terminal at CLT Airport, including a baggage handling control room, support space, and a break room. The predominant work will consist of typical finishes such as drywall, ceilings, flooring, mechanical, electrical, plumbing, and fire protection. The duration of the project is expected to be approximately four to six months. Most of the work will occur during the day, with material delivery and debris removal taking place at night.

Posting Number 04 2026-Q2(Apr-Jun)-AVI-20117

Anticipated Posting Date 2026-04-01

Commodity Code(s): 90910, 90911, 91075, 91468, 93633

The project involves the interior upfit of approximately 2,000 square feet of existing shell space on the baggage level of the main terminal at CLT Airport, including a baggage handling control room, support space, and a break room. The predominant work will consist of typical finishes such as drywall, ceilings, flooring, mechanical, electrical, plumbing, and fire protection. The duration of the project is expected to be approximately four to six months. Most of the work will occur during the day, with material delivery and debris removal taking place at night.

Requirements

Last Updated: 02/06/26
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Ryan Lingholm

Procurement Officer

Ryan.Lingholm@ci.charlotte.nc.us