Charlotte Fire Department plans to build a mass timber all-electric infill 2-story, 3-bay firehouse to manage response volumes in the newly developed River District. The facility will be approximately 14,600 square feet. The building is proposed to be located on Dixie River Road, near the future Catawba Crossing, and the parcel ID number is 14128101, parcel 3. The city is planning to utilize the Progressive Design-Build delivery system, city sustainability guidelines, city building standards, specifications, and past firehouse plans as a guide to meet the needs of the fire department. The city has completed the selection process for an Owner’s Advisor to assist with the procurement selection process for a design-build team.
River District Permanent Firehouse #44
Charlotte Fire Department plans to build a mass timber all-electric infill 2-story, 3-bay firehouse to manage response volumes in the newly developed River District. The facility will be approximately 14,600 square feet. The building is proposed to be located on Dixie River Road, near the future Catawba Crossing, and the parcel ID number is 14128101, parcel 3. The city is planning to utilize the Progressive Design-Build delivery system, city sustainability guidelines, city building standards, specifications, and past firehouse plans as a guide to meet the needs of the fire department. The city has completed the selection process for an Owner’s Advisor to assist with the procurement selection process for a design-build team.
CMAR Services – Ashley Road/Tuckaseegee Road & Freedom Drive Intersection
The project area includes the intersection area and approaches for Ashley Road/Tuckaseegee Road (State Road 1662), and Freedom Drive (NC Highway 27). Currently, the area lacks adequate pedestrian and bicycle infrastructure, limiting safe mobility and access to key destinations such as the Mecklenburg County Valerie C. Woodard Community Resource Center.
CMAR Services – Cross Charlotte Trail (XCLT) Matheson to Craighead
The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.
Cross Charlotte Trail (XCLT)− Matheson to Craighead
The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.
531 Spratt Street Roof Replacement
This work includes the provision of labor, material, equipment, supervision, and administration to integrate the work outlined in these specifications into the total building system such that no leakage into the system occurs. In general, the scope of work in the Base Bid includes Roof Areas A, B, C, D, & E: Remove and dispose of the existing roof system including flashings and sheet metal down to the existing steel deck. Secure the existing steel deck to structural framing members. Provide roof insulation system as specified in Section 07 22 16 “Roof Insulation”. Provide a cold adhesive applied two-ply modified bitumen roof membrane along with flashings and accessories as specified in Section 07 52 16 “Modified Bitumen Roofing”. Replace sheet metal flashings and trim as specified in Section 07 62 00 “Sheet Metal Flashing and Trim” Provide a complete, watertight, 20-year warrantable roof assembly. Exterior Wall Restoration: Replace through wall flashings at masonry elevation wall above roof level as specified in Section 07 65 00 “Through Wall Flashing”. Provide metal wall panels at elevation wall above roof level as specified in Section 07 42 13 “Metal Wall Panels”.
Charlotte Fire Station #2 – Addition and Renovations
The work consists of the addition and renovation of an existing fire station. The locker and restroom facilities will be renovated and expanded. Accessibility improvements are planned in various areas throughout the building and site.
Fire Station No. 27 Roof Replacement
This work includes the provision of labor, material, equipment, supervision and administration to integrate the work outlined in these specifications into the total building system such that no leakage into the system occurs.
CATS Light Rail Administration Facility Roof Recovery and Replacement
Roof Areas A, B, C and E (Re-Cover): a. Removal of lightning protection system and storage for reuse. b. Removal and disposal of all existing metal flashings, scupper liners and coping caps; installation of new polyisocyanurate roof insulation, gypsum cover board and overlay, fleeceback Polyvinyl-Chloride (PVC) roof membrane and flashings, wood blocking, metal flashings, coping caps, PVC scupper liners and all associated miscellaneous work as specified herein. c. Removal of existing brick along wall above roof level at Area D as necessary; and installation of new through-wall flashing and brick replacement consisting of use of salvaged brick if in good condition and providing new brick (to match existing) as required. d. Reinstallation of lightning protection system upon completion of the roofing work according to specifications and requirements of the original UL master label installation. 2. Roof Area D (Replacement): a. Removal of lightning protection system and storage for reuse. b. Removal and disposal of all existing metal flashings, coping caps (except along expansion joint at west side) and scupper liners, single-ply membrane and flashings, gypsum cover board, insulation, and gypsum underlayment; installation of new gypsum underlayment, flat and tapered polyisocyanurate roof insulation, gypsum cover board, fleeceback Polyvinyl-Chloride (PVC) roof membrane and flashings, wood blocking, metal flashings, coping caps, PVC scupper liners and all associated miscellaneous work as specified herein. c. Reinstallation of lightning protection system upon completion of the roofing work according to specifications and requirements of the original UL master label installation.