Scope Statement: CFD plans to build a temporary firehouse for the newly developed River District to manage response volumes in the area. The firehouse will be located on Dixie River Road, near the future Catawba Crossing, on parcel number 14128101.
The Phase 1 facility will be (1) triple wide trailer to house the firemen and a pre-engineered building to serve as an apparatus bay to house the fire engine and emergency equipment.
This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
The City of Charlotte is seeking a qualified provider of Fleet Shop Tools & Equipment to work in conjunction with Fleet Management. The Company shall provide fleet shop tools and equipment as needed by the City.
The City of Charlotte seeks a qualified company to provide Heavy-Duty Refuse Truck and Street Sweeper Truck Maintenance and Repair Services to work with Fleet Management. The Company shall perform maintenance, and repair services on fleet heavy-duty refuse truck and street sweeper truck equipment owned, operated, or maintained by the City.
This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347
Install decorative crosswalks (interconnected preformed thermoplastic), milling and resurfacing, and pavement markings.
The purpose of this project is to improve traffic flow on North Tryon Street by extending the left turn lane. This project will include lane widening, drainage and pavement markings.
This project will provide new sidewalk along Sardis Road North from Sardis Road to westernmost intersection of Rittenhouse Circle and Sardis Road North. Project length = 0.5 miles.
This project will include the following:
6′ Sidewalk
8′ Planting Strips
2′-6″ Curb and Gutter
Street Trees
Concrete Ped Refuge Island (between Kilcullen Dr. and Rittenhouse Circle)
Concrete Bus waiting pads
Retaining Walls
Curb Ramps
Storm Drainage
This Request for Qualifications is to select several firms to provide consulting engineering services on a task order on-call basis.
Generally, the Engineer will provide consulting services that may include planning, design, environmental, and construction administration. In addition, the Engineer may be asked to assist in the development of grant application as well as agreements including federal funding.
This Request for Qualifications is to select several firms to provide consulting engineering services on a task order on-call basis.
Generally, the Engineer will provide consulting services that may include planning, design, environmental, and construction administration. In addition, the Engineer may be asked to assist in the development of grant application as well as agreements including federal funding.