Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.

16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2 – DUPLICATE PLEASE ARCHIVE

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Pineville-Matthews Road/Alexander Road Sidewalk Project

This project will add sidewalk along Hwy 51 from Echo Forest Drive (Providence High School) to Alexander Road- and sidewalk on Alexander Road between Hwy 51 and Woodshed Court. The project will also add a right turn and a second left turn lanes on Alexander Road at Hwy 51. Project length= 1.0 mile.

I-85 North Bridge Construction

This project will connect Doug Mayes Place and Research Drive. The connection includes two bridges, one over I-85 and the other over Doby Creek. The bridge over I-85 will include aesthetic elements to create a gateway into Charlotte. The project will also realign the intersection of Research Drive and David Taylor Drive to provide more efficient travel through the intersection.

West Mallard Creek Church Road Shared- Use Path

This project is being built to add sidewalks as part of the city’s Capital Investment Fund to provide a safe, efficient, comfortable pedestrian system to improve the quality of life of its residents, visitors, and businesses. Improvements will be provided along the south side of West Mallard Creek  Church Road, from Mallard Creek Road to roughly 600′ east of Claude Freeman Drive. The project proposes a 12 ft. shared-use path, a typical 8 ft. planting strip (where possible), signalization and intersection improvements at David Taylor Drive, and intersection improvements at Claude Freeman Drive.

Painting Services

The Building Services Division of the General Services Department is responsible for maintaining a portfolio of approximately 200 buildings, including offices, fire stations, police division offices, and equipment shops that house various City activities. The city also maintains cultural facilities, including museums and arenas that serve as venues for sports, entertainment, and other events.

This contract shall provide painting services at various locations as identified by the City. Services could consist of providing all labor, materials, equipment, and supervision for the painting and finishing of new and existing interior surfaces, i.e., walls, doors, window frames, and other work as directed by the project manager.