McCullough Streetscape Project

Originating from the Northeast Corridor Infrastructure (NECI) Program, this project proposes to provide a new street connection by extending McCullough Drive from North Tryon Street to the existing dead end at Ken Hoffman Drive. This project will include two travel lanes, planting strips, curb & gutter, asphalt milling and paving, storm drainage, utility relocation, erosion control, bike lanes, sidewalk, Post Construction Stormwater Ordinance (PCSO) underground storage vaults, and retaining wall improvements. This project will improve pedestrian and bicycle mobility between North Tryon Street and W.T. Harris Boulevard.

JW Clay Blvd. Streetscape

The project will widen sections of JW Clay Blvd to a four-lane cross section with left turn lanes, bike lanes, cycle track, sidewalk, and other improvements.

Monroe Road Multi Use Path (MUP)

The purpose of this project is to provide safer pedestrian conditions along Monroe Road from Eaton Road to McCullen Way. Currently, there are two active city projects in the vicinity of this project. This MUP will fill a key gap between these two projects, providing a safer and more connected route for pedestrians and cyclists.

Shamrock Drive Complete Street

Project limits are from Beckwith Place to Flamingo Ave (0.9 miles). Project includes new turn lanes, sidewalks, painted buffered bike lanes, two roundabouts, wheelchair ramps, ped medians, driveways, curb and gutter, storm drainage, street trees, public art and pedestrian crossings.

Central Kilborne Norland Intersection & Street Upgrade

Project limits are from just south of Evergreen Cemetery Dr to about 400’ south of Central Ave at Kilborne Dr on Norland Rd (0.43 miles). The project includes a shared-use path on one side of the street, storm drainage, water line work, and 2 Rectangular Rapid Flashing Beacons (RRFBs).

Prosperity Church Road (Old Ridge to Benfield) Improvements

The project proposes to widen Prosperity Church Rd approximately 0.3 mi between Old Ridge Rd and Benfield Rd to provide curb and gutter, sidewalk, storm drainage, bicycle lanes, and on-street parking, as well as a roundabout at Prosperity Church Rd and Prosperity Ridge Rd.

Fire Station #36 HVAC Renovation

The mechanical demolition work consists of removing the five (5) existing split system gas furnaces and outdoor air-conditioning condensers, and the one (1) inline exhaust fan above the men’s locker room. All existing ceiling diffusers and grilles shall be demolished and replaced inplace in new work. Existing split system controls, bipolar ionization devices, furnace terminations, and ductwork are to be kept and reused in the new work. The new mechanical work consists of installing five (5) new split system heat pumps and gas furnaces in the same place as demolished split systems, and reusing controls, bipolar ionization, existing furnace intakes/vents and reconnecting to existing gas. Outside air dampers will be adjusted to reduce outside air flow. Existing controls will need to be reworked to account for the change from cooling-only coils to heat-pump coils. A new, smaller, inline fan will be installed in place of demolished fan above men’s locker. New diffusers and grilles will be installed in-place of demolished diffusers and grilles

Davidson- Jordan Place Intersection

To improve the North Davidson/ Jordan Place intersection and enhance multimodal transportation choices for users. This project will improve accessibility for pedestrian, bicycle, and vehicular connections to the 25th street light rail station.