Catawba River Water Pump Station Cell 4 – Pump Addition -CANCELLED

This project would add an additional pump to Cell #4 which is sized like the existing, and a capacity of 65 million gallons per day.

The Catawba River Water PS Cell 4 Pump Addition should be cancelled.  It has been pushed out in the CIP and will not be available in January 2024.  There is no updated timeline on this project.

Plaza Booster Pump Station Upgrades – CANCELLED

CANCELLED – This project is on hold (or potentially canceled) with no anticipated date to advertise in the next 18 months.

 

This project will include the rehabilitation of the Plaza Road and Idlewild Booster Pump Stations. The rehab will include motor control center, soft start drives, station programmable logic controller control panel, pumps, motors, controls valves, suction & discharge piping, generator/transfer switch and necessary building & roof upgrades.

Pump & Motor Repair

Provide repair and maintenance service for pumps and motors throughout Charlotte Water

Elevator Maintenance & Repair Service

Provide elevator maintenance and repair service to Charlotte Water locations

 

 

This project was cancelled, as Charlotte Water will use the city-wide elevator contracts.