Supply Water Treatment lab with Water Quality Analyzers
Old Dowd Rd Airport 24-inch Water Main – Cancelled
The project is approximately 3600 linear feet of 24 inch water main connecting the existing line at Old Down Road to the 24 inch line on the east side of the airport.
Six Mile Creek PS Improvements-Cancelled
The purpose of this project is to eliminate the long shafts between the pumps and motors. Custom motor stands will be built to position the motors over the pumps. The original two motors for this pump station will also be replaced.
Taggart Creek Outfall Flow Diversion Structure-Cancelled
Project consists of the design and construction of a flow diversion structure.
Upper Taggart Creek Outfall Replacement
Project includes the construction of approximately 10,200 linear feet of 36, 30, 24, and 18 inch gravity sewer to address capacity concerns in the Upper Taggart Creek Outfall.
PS & WAS Pipeline from Long Creek to Irwin Creek-Cancelled
Two separate lines will be needed for the solids transfer to handle the primary sludge (PS) and Waste Activated Sludge (WAS) respectively. The PS & WAS Pipelines from Long Creek to Irwin Creek will be approximately 12 miles.
PS & WAS Pipelines from Irwin to McAlpine-Cancelled
Two separate lines will be needed for the solids transfer to handle the PS and WAS respectively. The PS & WAS Pipelines from Irwin Creek to McAlpine Creek Wastewater Treatment Plant will be approximately 12 miles.
Catawba Raw Water Pump Station Cell 1 Rehabilitation (CANCELLED)
Replacement of the entire equipment, piping, master control centers and intake structure. Combined with Catawba Project
Catawba River Water Pump Station Cell 4 – Pump Addition -CANCELLED
This project would add an additional pump to Cell #4 which is sized like the existing, and a capacity of 65 million gallons per day.
The Catawba River Water PS Cell 4 Pump Addition should be cancelled. It has been pushed out in the CIP and will not be available in January 2024. There is no updated timeline on this project.