This project consists of improvements to the solids screenings, primary sludge pumping, sludge heating, solids conveyance, secondary digester mixing, and polymer system upgrades.
Mallard Creek Water Reclamation Facility (WRF) & Lee S. Dukes Water Treatment Plant (WTP) Standby Power & Electrical Improvements – Cancelled
The first project site is the Mallard Creek Water Reclamation Facility located at 12400 US 29 HWY, Charlotte, North Carolina 28262. The scope of work for this project is a new standby generator facility, the conversion of the existing utility service from 480V to 4160V, electrical upgrades to the existing blower building and the replacement of an existing electrical switchboard. The second project is the Lee S Dukes Water Treatment Plant located at 7980 Babe Stillwell Road, Huntersville, North Carolina 28078. The scope of work for this project is a new standby generator facility, the replacement of the existing 4kV switchgear and 4kV electrical duct bank to re-feed the existing transformers.
GIS Facilities Mapping – Cancelled
The project will cover aerial imagery and base mapping, maintain/replace survey equipment, easement mapping trimble licenses, and ESRI licenses.
Water Quality Sampling Stations
Installation of auto flushers, zone boundary bypass assemblies, and other water quality improvement installations.
Fiscal Year 2020, Water/Sewer infrastructure Construction – Contract 1
This project consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.
New Service Installation Water – Cancelled
Combined with another project
Energy Optimization – Pumping – Cancelled
This project will evaluate all pumping units in the water system.
Brookshire Campus Project – Cancelled
This project reviews the Franklin campus as a working facility for both Charlotte Water office personnel and Treatment Plant Operations.
McAlpine Large Diameter Sewer Rehabilitation – Phase 2
This project involves the rehabilitation of approximately 7,000 linear feet of reinforced concrete pipe (RCP) sewer outfall. The sewer outfall is located just south of Highway 51, running parallel to McAlpine Creek. The work will improve the structural integrity and performance of the sewer system.