Construction contract utilized for water main replacement. Replacement focuses on assets that have reached end of useful life that are now causing operational issues. Primarily focuses on assets that are 12” and smaller.
this opportunity was archived earlier
This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.
This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter of one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.
-inactive due to budget reprioritization
This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.
-inactive due to budget reprioritization
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.
This opportunity has been cancelled.
This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.
This will be a request for an Architectural and Engineering service package to retrofit the Franklin Water Treatment Plant Administrative Building. Phase 1 will include overall schematics, the proposed layout of the building, structural assessment, existing conditions drawings, and mapping. Phase 2 will include detailed engineering and structural design, along with architectural design. Phase 3 will include technology requests (Supervisory Control and Data Acquisition system, security, etc.), construction phasing/planning office spaces, finishings, exterior and landscaping. Phase 4 will include project permitting and construction admin services. There is a potential for the renovations to be broken up into smaller projects after Phase 1 is complete.
-inactive due to budget reprioritization