FY25 Large Service Contract #1 – CANCELLED

This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter of one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.

-inactive due to budget reprioritization

 

FY25 Small Service Contract #1 – CANCELLED

This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.

-inactive due to budget reprioritization

Belmont Lift Station and Force Main

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

Belmont Horizontal Directional Drilling Construction-cancelled

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.

This opportunity has been cancelled.

Belmont Pump Station Construction-cancelled

This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

This project has been consolidated

Franklin Water Treatment Plant Main Building Renovations – CANCELLED

This will be a request for an Architectural and Engineering service package to retrofit the Franklin Water Treatment Plant Administrative Building. Phase 1 will include overall schematics, the proposed layout of the building, structural assessment, existing conditions drawings, and mapping. Phase 2 will include detailed engineering and structural design, along with architectural design. Phase 3 will include technology requests (Supervisory Control and Data Acquisition system, security, etc.), construction phasing/planning office spaces, finishings, exterior and landscaping. Phase 4 will include project permitting and construction admin services. There is a potential for the renovations to be broken up into smaller projects after Phase 1 is complete.

-inactive due to budget reprioritization

Sanitary Sewer Rehab – cancelled

This will be for a construction contract utilized for sanitary sewer rehab and repairs. Work will be focused on failed or failing sanitary sewer collection system assets. Work performed for this contract will help prevent future sanitary sewer overflows.

this opportunity was archived earlier

Sanitary Sewer Rehab-CANCELLED

This will be for a construction contract utilized for sanitary sewer rehab and repairs. Work will be focused on failed or failing sanitary sewer collection system assets. Work performed for this contract will help prevent future sanitary sewer overflows.

Cancelled as of 10/21/2024

FY25 Street Mains Extensions Contract 1 – CANCELLED

This contract will be for the construction of an undetermined number of street mains extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.

Cancelled as of 3/25/2024.