Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd. 4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place. 2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement. 4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.
Storm Water Repair and Improvement FY2024-A
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.
Collective Y Storm Drainage Improvement Project
The project consists of multiple isolated storm drainage improvement projects located within the northeast and southeast service areas of the City of Charlotte. Projects include storm drainage improvements and replacement of existing storm drainage systems facilities within the street right-of-way and private, residential properties
Amity Springs Drive 5801
This project is located on Amity Springs Drive near the intersection with Iron Gate Lane. The existing drainage system consists of open channel and culvert under a private road. The improvements include culvert upgrades.
Amity Springs Drive 5801
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.
Summerlin Storm Drainage Improvement Project
The Summerlin Place Storm Drainage Improvement Project will add additional catch basins along Summerlin Place and install a new drainage system down Wessynton Dr and a small portion of Brynwood Drive. The project consists of installation of RCP, CB’s, MH’s, C&G replacement, sewer line replacement, and CIPP lining.
Sardis Oaks Storm Drainage Improvement Project
This project is located on Sardis Oaks Road between Sardis Road North and Rock Point Road. The existing drainage system consists of pipe under city-maintained roads. The improvements include pipe system upgrades.
619 Cedar St Storm Drainage Improvement Project
This project is located on South Cedar Street between Stadium View Drive and Westmere Avenue. The existing drainage system consists of a culvert under a city-maintained road. The Project consists of replacing a failing culvert crossing at 619 Cedar St. with new installation of a box culvert.
Delane Ave 1220 Storm Drainage Improvement Project
The Delane Ave 1220 storm drainage improvement project will make drainage improvements along Delane Ave from Wright Ave to approximately 80 ft past Castleton Rd. Drainage and water line improvements will be made along Castleton Rd from Delane Ave to Lomax Ave. Improvements will consist of new drainage structure, new pipe alignments, curb and gutter along Delane Ave, and the extension of a 6” water line down Castleton Rd.