Specialized stormwater services
Collective Package C
Storm Drainage Improvement Project to address failing storm drainage systems in the following locations:
– 1301 Ranch Road (Council District 2),
– 1308 Interurban Avenue (Council District 2),
– 7259 Point Lake Drive (Council District 5),
– 1331 Kingscross Drive (Council District 6),
– 2114 Shadyview Drive (Council District 6),
– 2217 Archdale Drive (Council District 6), and
– 11143 Ballantyne Crossing Avenue (Council District 7).
Collective Package D
Storm Drainage Improvement Project
Shadyview Drive Storm Drainage Improvement Project
Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
7259 Point Lake Drive Storm Drainage Improvement Project
Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
McAlpine SR2 and SR3 Stream Repairs – CANCELLED
The purpose of the project is to repair approximately 700 linear feet of stream restoration between 2 different tributaries. Failing structure will be replaced or repaired such that they function as originally intended. Repairs will be performed with minimal disturbance to buffer vegetation and vegetation of appropriate size will be re-established after repairs are completed. Repairs will include but not limited to, removing and resetting boulders and logs for in-stream structures and adding or repairing constructed riffles.
This will not be bid
Alanhurst/Cherrycrest Storm Drainage Improvement Project
Storm Drainage Improvement Project
Kenilworth/Romany Storm Drainage Improvement Project
Storm Drainage Improvement Project
Hampton Storm Drainage Improvement Project
Storm Drainage Improvement Project