Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

  • Aviation
  • Charlotte Area Transit System
  • Charlotte Communications & Marketing
  • Charlotte Department of Transportation
  • Charlotte Fire Department
  • Charlotte Mecklenburg Police Department
  • Charlotte Planning, Design & Development
  • Charlotte Storm Water Services
  • Charlotte Water
  • City Attorney’s Office
  • City Clerk
  • City Manager's Office
  • City Wide
  • Community Relations
  • Department of General Services
  • Economic Development
  • Finance
  • Housing & Neighborhood Services
  • Human Resources
  • Innovation & Technology
  • Internal Audit
  • Solid Waste Services
  • Strategy & Budget

Solicitation Category

  • Architectural / Engineering Services
  • Commodities & Goods
  • Construction
  • Construction Cost Estimating
  • General Services
  • Technology Goods & Services

Utilization

  • SBE-Small Business Enterprise
  • DBE-Disadvantaged Business Enterprise
  • MBE-Minority Business Enterprise
  • WBE-Women Owned Business Enterprise

Expected Release Date

From Date

To Date

Estimated Total Value

  • $10,000 - 49,999
  • $50,000 - 99,999
  • $100,000 - 249,999
  • $250,000 - 499,999
  • $500,000 - 999,999
  • $1,000,000 -4,999,999
  • $5,000,000 - 9,999,999
  • $10,000,000+
Clear

Opportunities per Page

In Development charlotte water

Charlotte Water / Construction

Belmont Pump Station Construction

  • Posting Number: 2026-Q2(Apr-Jun)-CW-12294
  • Anticipated Posting Date: 2026-04-15
  • Last Updated: 07/09/25
Add to Calendar 2026-04-15 2026-04-15 Belmont Pump Station Construction

This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

In Development charlotte water

Charlotte Water / Construction

Sanitary Sewer Point Repair and Replacements

  • Posting Number: 2025-Q4(Oct-Dec)-CW-18578
  • Anticipated Posting Date: 2025-11-27
  • Last Updated: 07/09/25
Add to Calendar 2025-11-27 2025-11-27 Sanitary Sewer Point Repair and Replacements

This contract is for the rehabilitation of manholes, repair of sewer system defects and service laterals, installation of new sewers and manholes to replace existing, installation of cured-in-place pipe lining, pipe bursting, other miscellaneous manhole rehabilitation work, and all preparatory work such as sewer cleaning and television inspection.

In Development charlotte water

Charlotte Water / General Services

Leak Detection Services

  • Posting Number: 2025-Q3(Jul-Sep)-CW-18576
  • Anticipated Posting Date: 2025-09-27
  • Last Updated: 07/09/25
Add to Calendar 2025-09-27 2025-09-27 Leak Detection Services

Charlotte Water is seeking to contract with a qualified firm to provide professional water leak detection services across its residential service lines and public water mains. The selected vendor will be expected to utilize specialized tools and systems capable of detecting underground leaks and identifying areas of current loss with precision and minimal disruption. Services may involve advanced acoustic, chemical, and pressure-based testing methods, along with the use of pipeline diagnostic equipment to support field verification. This work will contribute to Charlotte Water’s ongoing efforts to reduce non-revenue water, improve infrastructure reliability, and proactively manage aging assets.

In Development charlotte water

Charlotte Water / Architectural / Engineering Services

Professional Engineering Services for Emergency and Routine Repair Ser ... Professional Engineering Services for Emergency and Routine Repair Services

  • Posting Number: 2026-Q4(Oct-Dec)-CW-8783
  • Anticipated Posting Date: 2026-10-10
  • Last Updated: 07/09/25
Add to Calendar 2026-10-10 2026-10-10 Professional Engineering Services for Emergency and Routine Repair Services

Charlotte Water is soliciting Statement of Qualifications from qualified engineering firms to provide survey, design, contract administration, construction inspection services, and other engineering services as requested.  The engineering services requested will be for routine and emergency water distribution and collection system repair projects.

In Development charlotte water

Charlotte Water / Construction

Fiscal Year 2026 Water Main Replacement

  • Posting Number: 2026-Q2(Apr-Jun)-CW-18568
  • Anticipated Posting Date: 2026-04-30
  • Last Updated: 07/09/25
Add to Calendar 2026-04-30 2026-04-30 Fiscal Year 2026 Water Main Replacement

This construction contract is designated for the replacement of aging water main infrastructure. The scope of work primarily targets water mains that have reached or exceeded their expected service life and are now contributing to operational challenges such as increased maintenance, reduced reliability, and potential service interruptions. Priority is given to pipeline segments 12 inches in diameter or smaller. This contract supports Charlotte Water’s long-term asset management strategy by improving system resilience, reducing unplanned outages, and enhancing overall water service reliability.

 

In Development charlotte water

Department of General Services / Construction

Monroe Road Streetscape

  • Posting Number: 2025-Q3(Jul-Sep)-DGS-8925
  • Anticipated Posting Date: 2025-07-01
  • Last Updated: 07/09/25
Add to Calendar 2025-07-01 2025-07-01 Monroe Road Streetscape

Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center.  Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.

In Development charlotte water

Department of General Services / Construction

Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025) ... Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

  • Posting Number: 2027-Q2(Apr-Jun)-DGS-14020
  • Anticipated Posting Date: 2027-04-01
  • Last Updated: 07/09/25
Add to Calendar 2027-04-01 2027-04-01 Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

July 2025 Update: This project will not go out for public bid; it is now being designed and constructed through a reimbursement agreement with a private developer

In Development charlotte water

Aviation / Construction

Part 139 Remediation & Runway Redesignation

  • Posting Number: 2025-Q3(Jul-Sep)-AVI-17228
  • Anticipated Posting Date: 2025-08-25
  • Last Updated: 07/09/25
Add to Calendar 2025-08-25 2025-08-25 Part 139 Remediation & Runway Redesignation

The project includes markings and signage to support updating the Runway Nomenclature of CLT’s existing three parallel runways to support the construction of the Fourth Parallel Runway. The Runway Nomenclature updates will be planned under 3 different charting dates with FAA throughout the project that will be coordinated with the FAA charting schedule. The project will also include updates to existing taxiway marking, signage, lighting and paved shoulders.

In Development charlotte water

Charlotte Water / Construction

McAlpine Creek WRRF  Digesters Rehabilitation 

  • Posting Number: 2027-Q3(Jul-Sep)-CW-18600
  • Anticipated Posting Date: 2027-07-15
  • Last Updated: 07/09/25
Add to Calendar 2027-07-15 2027-07-15 McAlpine Creek WRRF  Digesters Rehabilitation 

The McAlpine Digesters Rehabilitation project focuses on restoring key components of the biosolids treatment facilities. This includes structural repairs and a new cover for the first digested sludge storage tank, along with installation of new sludge pumps, valves, and piping. The project also replaces an outdated programmable logic controller system and adds a new sludge line to separate gravity-fed and pumped flows. Additional improvements include a new dewatering well system for draining the storage tanks and structural evaluation and repairs to the second digested sludge storage tank.

 

 

 

 

 

 

 

 

 

 

In Development charlotte water

Charlotte Water / Construction

Belmont Horizontal Directional Drilling Construction

  • Posting Number: 2026-Q2(Apr-Jun)-CW-18602
  • Anticipated Posting Date: 2026-04-15
  • Last Updated: 07/09/25
Add to Calendar 2026-04-15 2026-04-15 Belmont Horizontal Directional Drilling Construction

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.

In Development charlotte water

Charlotte Water / Construction

Davidson Eastern Rocky River Sanitary Sewer Outfall

  • Posting Number: 2025-Q4(Oct-Dec)-CW-18604
  • Anticipated Posting Date: 2025-12-01
  • Last Updated: 07/09/25
Add to Calendar 2025-12-01 2025-12-01 Davidson Eastern Rocky River Sanitary Sewer Outfall

This contract will be for the design and construction of a gravity outfall sewer along the Rocky River. This project will consist of approximately 3,600 linear feet of 15-inch and 2,400 linear feet of 12-inch gravity sanitary sewer piping. This outfall is tributary to the existing Rocky River outfall in Cabarrus County and Water and Sewer Authority of Cabarrus County (WSACC) Rocky River Regional Wastewater Treatment Plant.

This opportunity was archived earlier.

In Development charlotte water

Charlotte Water / Construction

Elevated Water Storage Tanks Improvements

  • Posting Number: 2025-Q4(Oct-Dec)-CW-18606
  • Anticipated Posting Date: 2025-12-04
  • Last Updated: 07/09/25
Add to Calendar 2025-12-04 2025-12-04 Elevated Water Storage Tanks Improvements

This project involves the design and construction administration for the rehabilitation of five separate elevated water storage tanks. Each tank will undergo interior and exterior recoating to extend its service life and improve corrosion resistance. The scope also includes the replacement of outdated ladder systems to enhance safety and compliance. Miscellaneous piping repairs will be completed as needed to restore functionality and improve overall system performance. The project is managed to ensure coordination, quality control, and adherence to regulatory standards throughout design and construction.

 

 

 

 

 

1 2 4 5 6 20 21