Opportunities per Page
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
From Date
To Date
Opportunities per Page
Aviation / General Services
Program Management Information System Support Services
Aviation / General Services
Airport Zones 2 and 3 Landscape Maintenance
This project is to perform landscape maintenance in zones two and three within the campus of Charlotte Douglas International Airport. Zone 2 is primarily made up of areas along Billy Graham Parkway and the airport’s parking lots. Zone 3 is primarily made up of areas along Wallace Neal Rd., ARFF Rd., West Blvd., and Piper Lane. The daily and weekly tasks include mowing, edging, spraying, trash pickup, pruning, and mulching. These areas are to be clean and manicured to present aesthetically pleasing appearance to the public.
Aviation / Construction
Concourse E – Phase 10
This project consists of a single-story addition to concourse E just south of aircraft envelope E4 and adjacent to the employee turnstile. The addition is primarily a shell space to be leased to a tenant or stakeholder for the final buildout. The base bid is for a 4,350 Square Feet (SF) addition and associated site work with two add alternates to increase the total SF by an additional 1,400 SF per alternate. Scopes of work that are included in this project but not limited to are: selective demolition, concrete SOG, structural steel, metal decking, miscellaneous steel fabrications, rough carpentry, PVC roofing and sheet metal, insulated core metal wall panels, waterproofing, joint sealants, HM doors and frames, door hardware, glazing, non-structural framing, gypsum board, acoustical panel ceilings, sheet carpeting, resilient base and accessories, painting, pre-engineered interior wall panel systems, resinous terrazzo flooring, signage, wall protective coverings, corner guards, fire protection specialties, plumbing, HVAC, electrical, fire sprinkler & telecommunications.
Charlotte Water / Commodities & Goods
Water Treatment Polymers
The scope of this Invitation to Bid (ITB) is to establish a contract for the purchase, delivery, and other inherently related activities of liquid emulsion polymer for solids dewatering for Charlotte Water’s Franklin Water Treatment Plant.
Aviation / Construction
Concourse A Modifications
This Project aims to modify and relocate existing equipment, replace tables, add an experiential element, and extend tenant services at the Charlotte Douglas International Airport. The modifications of the existing equipment will accommodate a dual-use system at each Gate Counter including the electrical and data infrastructure leading up to the network. There will be a Flight Information Display System” that will need to be relocated in the connecting corridor which includes structural attachments to the building and repairs to the existing Terrazzo. Work hours between 2300 – 0500 EST to prevent disruption to Airport Operations. This project will require 100% badging for all workers.
Charlotte Water / Construction
Ashe Plantation Lift Station
The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.
Charlotte Water / General Services
Standby Power and Instrumentation at Tank Sites
This construction contract includes the installation of new natural gas or propane-powered generators at multiple water storage tank sites. The work also involves associated miscellaneous electrical improvements necessary to support standby power functionality. These upgrades are intended to enhance system reliability and ensure continuous operation during power outages.
Charlotte Water / Architectural / Engineering Services
Elevated Water Tank Rehabilitation
This project involves the rehabilitation of existing elevated water storage tanks to restore structural integrity and operational efficiency. Associated work includes improvements to nearby waterlines to ensure reliable connectivity to the tanks. Site work may include clearing, grading, and other modifications necessary to support the rehabilitation activities. The goal is to extend the service life of the tanks and maintain consistent water system performance.
Charlotte Water / Construction
McDowell Creek Wastewater Treatment Plant Primary Clarifier and Influe ... McDowell Creek Wastewater Treatment Plant Primary Clarifier and Influent Pumping Station Rehab
This project includes the demolition and disposal of the existing Primary Clarifier No. 5 (PC No. 5) mechanism and associated components, followed by the installation of a new Owner-procured clarifier mechanism. Additional work at PC No. 5 includes structural repairs, replacement of exposed piping and valves, modifications to existing chemical feed dosing points, and upgrades to slide and sluice gate components. At the Influent Pump Station (IPS), the project involves replacing existing grit piping and stainless steel air piping. The IPS scope also includes the replacement of slide gate seals, actuators, and stems to ensure continued operational reliability.
Charlotte Water / Construction
Belmont Pump Station Construction
This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.
Charlotte Water / Construction
Sanitary Sewer Point Repair and Replacements
This contract is for the rehabilitation of manholes, repair of sewer system defects and service laterals, installation of new sewers and manholes to replace existing, installation of cured-in-place pipe lining, pipe bursting, other miscellaneous manhole rehabilitation work, and all preparatory work such as sewer cleaning and television inspection.
Charlotte Water / Architectural / Engineering Services
Professional Engineering Services for Emergency and Routine Repair Ser ... Professional Engineering Services for Emergency and Routine Repair Services
Charlotte Water is soliciting Statement of Qualifications from qualified engineering firms to provide survey, design, contract administration, construction inspection services, and other engineering services as requested. The engineering services requested will be for routine and emergency water distribution and collection system repair projects.
This scope of work outlines the provision of comprehensive support services for the Program Management Information System (PMIS) and Work and Asset Management (WAM) system at Charlotte Douglas International Airport (CLT). It includes the continued configuration and implementation of the PMIS to meet CLT’s project management requirements, support for accurate and efficient data management, development of customized reporting and analytics, and maintenance of system performance through ongoing support and updates. The goal is to ensure these systems effectively support CLT’s project delivery, collaboration, and decision-making processes.