Earlybird, Business Opportunity Pipeline, City of Charlotte

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

Solicitation Category

Utilization

Expected Release Date

Estimated Total Value

Clear

In Development Charlotte Water

Charlotte Water / Technology Goods & Services

Automatic Meter Reading (AMR) Replacement Phase 3

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17257
  • Anticipated Posting Date: 2025-12-12
  • Last Updated: 10/02/25
Add to Calendar 2025-12-12 2025-12-12 Automatic Meter Reading (AMR) Replacement Phase 3

This project will upgrade the existing meter reading system to a self-reporting network and replace end of life residential meters. Existing communication endpoints not compatible with the network selected will be replaced. Most residential meters will be replaced; those meters not replaced will require a replacement register compatible with the new endpoints. Commercial meters will receive replacement registers or be replace, depending on compatibility with the selected network solution. The communication network, hourly interval data and customer access portal will improve customer experience, increase billing efficiency and accuracy, reduce system losses and operational expenses, and improve system monitoring and planning.

In Development Charlotte Water

Charlotte Water / Construction

Fiscal Year 2026 Water Main Replacement

  • Posting Number: 2026-Q2(Apr-Jun)-CW-18568
  • Anticipated Posting Date: 2026-04-30
  • Last Updated: 10/02/25
Add to Calendar 2026-04-30 2026-04-30 Fiscal Year 2026 Water Main Replacement

This construction contract is designated for the replacement of aging water main infrastructure. The scope of work primarily targets water mains that have reached or exceeded their expected service life and are now contributing to operational challenges such as increased maintenance, reduced reliability, and potential service interruptions. Priority is given to pipeline segments 12 inches in diameter or smaller. This contract supports Charlotte Water’s long-term asset management strategy by improving system resilience, reducing unplanned outages, and enhancing overall water service reliability.

 

In Development Charlotte Water

Charlotte Water / Construction

Belmont Pump Station Construction

  • Posting Number: 2026-Q2(Apr-Jun)-CW-12294
  • Anticipated Posting Date: 2026-04-15
  • Last Updated: 10/02/25
Add to Calendar 2026-04-15 2026-04-15 Belmont Pump Station Construction

This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

In Development Engineering Property Management

Department of General Services / Construction

McCullough Drive Extension

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-17950
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 10/02/25
Add to Calendar 2026-01-01 2026-01-01 McCullough Drive Extension

An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles

In Development Engineering Property Management

Department of General Services / Construction

Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025) ... Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

  • Posting Number: 2027-Q2(Apr-Jun)-DGS-14020
  • Anticipated Posting Date: 2027-04-01
  • Last Updated: 07/09/25
Add to Calendar 2027-04-01 2027-04-01 Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

July 2025 Update: This project will not go out for public bid; it is now being designed and constructed through a reimbursement agreement with a private developer

In Development Engineering Property Management

Department of General Services / Construction

Firehouse 44

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-18355
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 06/23/25
Add to Calendar 2026-01-01 2026-01-01 Firehouse 44

Firehouse 44 will be an integral asset to support Charlotte Fire Department’s efficient response to emergencies in the community; providing a location within the newly developed River District community and expanding their response area in this newly incorporated region of Charlotte. This 14,600 SF, two-story, 3-bay facility will be the first mass timber firehouse in the Southeast US and will meet Living Future’s (LF) Zero Carbon certification for total project embodied carbon. The project will comply with Charlotte’s Sustainable Facilities Policy and fully support the sophisticated and time-sensitive operations of the Fire Department.

In Development Engineering Property Management

Department of General Services / Construction

Old Concord Road Shared-Use Path (Meadow Vista to Arlyn Cir)

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-17201
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 02/03/25
Add to Calendar 2026-04-01 2026-04-01 Old Concord Road Shared-Use Path (Meadow Vista to Arlyn Cir)

This project will construct a shared-use path along the west side of Old Concord Road from Meadow Vista Road to Arlyn Circle. Construction of driveway improvements and wheelchair ramps are included in this scope. The construction of the shared-use path will help to improve safety and walking conditions for citizens along this minor thoroughfare. This project will also connect several miles of pedestrian walkways within this area. Old Concord Road Shared-Use Path is considered a high priority project based on CDOT’s sidewalk Priority list and was requested by the residents and business owners in the area. Improvements for Charlotte Water are also included in the project scope. Project Length= .85 miles.