Earlybird, Business Opportunity Pipeline, City of Charlotte

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

Solicitation Category

Utilization

Expected Release Date

Estimated Total Value

Clear

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

6th and Graham Storm Drainage Improvement Project

  • Posting Number: 2027-Q2(Apr-Jun)-CSWS-3467
  • Anticipated Posting Date: 2027-06-15
  • Last Updated: 02/20/26
Add to Calendar 2027-06-15 2027-06-15 6th and Graham Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development Aviation

Aviation / Construction

South Ramp Expansion Bid Package 1

  • Posting Number: 2026-Q3(Jul-Sep)-AVI-20166
  • Anticipated Posting Date: 2026-08-11
  • Last Updated: 02/16/26
Add to Calendar 2026-08-11 2026-08-11 South Ramp Expansion Bid Package 1

Package 1 of the South Ramp Expansion Program for Charlotte Douglas International Airport (CLT or the Airport) is the first phase of construction of the overall program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. The scope of work will include but is not limited to pavement demolition, cement concrete pavement, asphalt shoulder paving, grading, drainage, erosion and sediment control, pavement markings, and airfield electrical installation.

In Development Aviation

Aviation / Construction

FBO Apron Expansion & Rehab

  • Posting Number: 2026-Q4(Oct-Dec)-AVI-20098
  • Anticipated Posting Date: 2026-10-13
  • Last Updated: 02/12/26
Add to Calendar 2026-10-13 2026-10-13 FBO Apron Expansion & Rehab

The Fixed Based Operator (FBO) Apron Expansion & Rehab project will construct additional aircraft parking area on the FBO apron, construct a new taxilane entrance stub to the FBO ramp, widen the existing entrance stub to support Airplane Design Group (ADG) V movements, and rehabilitate select pavements areas on the FBO ramp for Taxiway Design Group (TDG)-V aircraft. The apron expansion will remove an existing trailer office and auto parking space by converting the area to aircraft pavement that will adjoin the Bank of America apron area. The project scope will include building and parking area demolition, security fencing, asphalt and concrete pavement, airfield electrical, and airfield pavement markings.

In Development Aviation

Aviation / Construction

Runway 18/36 and Taxiway Delta Rehab Construction

  • Posting Number: 2026-Q4(Oct-Dec)-AVI-17499
  • Anticipated Posting Date: 2026-12-14
  • Last Updated: 02/10/26
Add to Calendar 2026-12-14 2026-12-14 Runway 18/36 and Taxiway Delta Rehab Construction

Charlotte Douglas International Airport (“CLT”) intends to issue an Invitation to Bid (“ITB”) for the rehabilitation construction of Runway 18L/36R and Taxiway D.  The scope of this work will include but is not limited to asphalt milling, paving, airfield electrical work, and pavement makings.

In Development Charlotte Water

Charlotte Water / Construction

Fiscal Year 2027 Small Diameter Water and Sewer Services Contract

  • Posting Number: 2026-Q2(Apr-Jun)-CW-17902
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 02/06/26
Add to Calendar 2026-04-01 2026-04-01 Fiscal Year 2027 Small Diameter Water and Sewer Services Contract

This contract will provide installation services for small-diameter water and sewer service connections within the Charlotte Water service area. It will replace the existing FY24 Small Service Contract #2. The project ensures continued expansion and maintenance of service connections across the region.

In Development Charlotte Area Transit System

Charlotte Area Transit System / Construction

Hambright Park and Ride Construction Project

  • Posting Number: 2026-Q2(Apr-Jun)-CATS-17992
  • Anticipated Posting Date: 2026-05-05
  • Last Updated: 02/06/26
Add to Calendar 2026-05-05 2026-05-05 Hambright Park and Ride Construction Project

The Charlotte Area Transit System (CATS) anticipates contracting out the construction of the Hambright Park & Ride.  The proposed Hambright Park and Ride will be an approximately 460 parking space mobility hub to provide rapid transit services to the Town of Huntersville, NC and surrounding areas by utilizing the newly constructed express lane direct connect. The project will also include a new public street to access the site, driver comfort station (driver restroom facilities), internal pedestrian circulation, provisions for a mobility hub for micro-mobility options and/or shared ride services, site security and surveillance, and sustainability components.

PSR # 1883

In Development Charlotte Water

Charlotte Water / Architectural / Engineering Services

Owner’s Advisor for the Lee S. Dukes WTP Expansion

  • Posting Number: 2026-Q1(Jan-Mar)-CW-19815
  • Anticipated Posting Date: 2026-01-12
  • Last Updated: 12/30/25
Add to Calendar 2026-01-12 2026-01-12 Owner’s Advisor for the Lee S. Dukes WTP Expansion

This Contract will be for Owner’s Advisor services the upcoming design and subsequent construction of the proposed Lee S. Dukes WTP Expansion and associated infrastructure projects. The Owner’s Advisor professional services will start during procurement and continue through construction/warranty phases of infrastructure associated with the Lee S. Dukes WTP Expansion project.

In Development Charlotte Water

Charlotte Water / Construction

Progressive Design-Build Services for Lee S. Dukes WTP Expansion

  • Posting Number: 2026-Q1(Jan-Mar)-CW-19817
  • Anticipated Posting Date: 2026-03-23
  • Last Updated: 12/30/25
Add to Calendar 2026-03-23 2026-03-23 Progressive Design-Build Services for Lee S. Dukes WTP Expansion

This Contract is for the design and construction of the Lee S. Dukes WTP Expansion project. The first phase of this project will include the start-up of a new 18 MGD conventional treatment train and additional associated structures, processes, and appurtenances, including residuals basins, high service pumping, clearwell storage, and standby power. The Design-Builder will work with Owner and Owner’s Advisor to determine the treatment processes, final layout, sizing, and specific facilities to meet the Owner’s goals for this project. The Design-Builder will provide the resources and staff to deliver the final project that will include, but not be limited to: Facility Planning and Preliminary Design, Permitting, Detailed Design, Cost Estimating, Construction, Start-Up and Commissioning.

In Development Engineering Property Management

Department of General Services / Architectural / Engineering Services, Construction

Bryant Farms Phase 2 (Progressive Design-Build)

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-18259
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 12/24/25
Add to Calendar 2026-01-01 2026-01-01 Bryant Farms Phase 2 (Progressive Design-Build)

This purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.

Interested? Learn more at our Industry Day Event on 11/17!

For additional information about the Draft RFP and to view the sign in sheet from the industry day, please see the links below.

  • Sign-In Sheet (compressed to 2.5MB):

https://charlottenc.gov/files/sharedassets/city/v/1/growth-and-development/doing-business-with-the-city/documents/solicitations/city-procurement/general-services/bryantfarmsph2/bryant-farms-ext-pii-industry-day-sign-in-sheet-2025-11-17.pdf

  • RFP (compressed to 28MB – due to large file size please allow additional time to load):

https:///files/sharedassets/city/v/1/growth-and-development/doing-business-with-the-city/documents/solicitations/city-procurement/general-services/bryantfarmsph2/rfq-bryant-farms-phase-2-2025-11-24.pdf

Please have all questions submitted by 5pm on Monday December 8, 2025 to Carlos Alzate (Carlos.Alzate@charlottenc.gov)

  • Public Industry Day Q&A:

https://www.charlottenc.gov/files/sharedassets/city/v/1/growth-and-development/projects/documents/general-services/bryant-farms/bryant-farms-rd-ext-phii-industry-day-qa.pdf 

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Louise Ave Storm Drainage Improvement Project

  • Posting Number: 2026-Q2(Apr-Jun)-CSWS-3434
  • Anticipated Posting Date: 2026-04-15
  • Last Updated: 12/17/25
Add to Calendar 2026-04-15 2026-04-15 Louise Ave Storm Drainage Improvement Project

This construction project is located just east of downtown along an unnamed tributary to Little Sugar Creek on Louise Ave. The purpose and need for the project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

In Development Aviation

Aviation / General Services

Airport Traffic and Curb Support Services

  • Posting Number: 2026-Q2(Apr-Jun)-AVI-19691
  • Anticipated Posting Date: 2026-05-15
  • Last Updated: 12/11/25
Add to Calendar 2026-05-15 2026-05-15 Airport Traffic and Curb Support Services

Seeking proposals for a supplier to provide direct vehicular and pedestrian traffic on the airport roadways and curb in front of the the terminal building while enforcing airport bylaws, rules, and regulations.

In Development Aviation

Aviation / General Services

Building Management Systems – Subject To Change

  • Posting Number: 2027-Q2(Apr-Jun)-AVI-14659
  • Anticipated Posting Date: 2027-05-30
  • Last Updated: 12/08/25
Add to Calendar 2027-05-30 2027-05-30 Building Management Systems – Subject To Change

CLT is seeking proposals from qualified and experienced companies interested in maintaining existing or providing a Building Management Systems to monitor access control, cameras, HVAC and fire detection at the main Terminal, old Terminal building and at the CLT
Center.