Opportunities per Page
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
From Date
To Date
Opportunities per Page
Department of General Services / Construction
Solid Waste EVSE
Charlotte Department of Transportation / General Services
Snow and Ice Removal –DUPLICATE
Charlotte Department of Transportation / Construction
Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)-DU ... Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)-DUPLICATE
Aviation / Construction
Valet Parking Upfit
Charlotte Area Transit System / Commodities & Goods
BOD Fork Lifts
Aviation / Construction
Relocation of West Boulevard (NC 160) (Construction)
Department of General Services / Construction
Rea Road Widening (I-485 to Williams Pond Lane)
The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.
Charlotte Storm Water Services / Architectural / Engineering Services
Professional Engineering Services for Minor Storm Drainage Projects
Department of General Services / General Services
Heavy Truck Collision Repair Services
Aviation / Construction
Concourse E Moving Walkways
Department of General Services / Construction
Cross Charlotte Trail (XCLT)− Brandywine to Tyvola
Aviation / Architectural / Engineering Services
On-Call Material Testing and Special Inspections Services
In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030. The Solid Waste facility currently contains many refuse collection vehicles that are run on gasoline. In order to meet the 2030 target, The City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the Solid Waste facility with EV Chargers for refuse collection vehicles.