North Yard Storage Site Construction

The project will include construction up-fits at the North Yard Facility with intentions of utilizing the area as storage for CATS. The storage yard, also known as the North Yard Annex, will be a secured and monitored area with access control, security lighting, CCTV cameras, fencing, and power supply capable of providing climate control measures to material as needed.

PSR # 1840

Runway 18L/36R and Taxiway Delta Rehab Construction

Charlotte Douglas International Airport (“CLT”) intends to issue an Invitation to Bid (“ITB”) for the rehabilitation construction of Runway 18L/36R and Taxiway D.  The scope of this work will include but is not limited to asphalt milling, paving, airfield electrical work, and pavement makings.

RFQ: Design-Builder – CMPD Helicopter Hangar Relocation

Relocation of existing CMPD Helicopter Hangar to an off-site location alongside Billy Graham Parkway will be performed via Alternative Delivery Method, specifically Design-Build (D/B).  A D/B team will be solicited to implement the project scope.

Part 139 Remediation & Runway Redesignation

The project includes markings and signage to support updating the Runway Nomenclature of CLT’s existing three parallel runways to support the construction of the Fourth Parallel Runway. The Runway Nomenclature updates will be planned under 3 different charting dates with FAA throughout the project that will be coordinated with the FAA charting schedule. The project will also include updates to existing taxiway marking, signage, lighting and paved shoulders.

Airport Overlook Lighting Enhancements

This project will enhance the current lighting around the Charlotte Douglas International Airport’s (CLT) overlook site (“Airport Overlook”) located at 5130 Airport Overlook Drive, Charlotte, NC 28208. The scope includes replacing a portion of existing light poles, foundations, and bollards with new poles and fixtures to better illuminate the overlook playground, memorial, and turf area.

Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.