This project involves installing a closed drainage system down both Briargrove Dr. and Milton Rd. to reroute runoff from an existing stream. The proposed closed drainage system ties back into the existing culvert under Colby Pl.
718 Harwyn Dr. Storm Drainage Improvement Project
Project proposed to replace an existing culvert system under Harwyn Dr. with 2 – 3×5 box culverts, as well as a pipe cleaning effort through the triple 54” RCP culvert at downstream Eaves Ln.
Harrisburg Road Shared Use Paths (SUPs)
Improvements on Harrisburg Road to create a more pedestrian-oriented corridor, between Ponderosa Pine Lane and Colwick Hill Road, Robinson Church Road and Timbertop Lane, and Winterwood Place and Sam Dee Road. Improvements will primarily include shared use path, drainage, curb and gutter, mid-block pedestrian crossing and milling and overlay of asphalt.
Harrisburg Road Shared Use Path (SUP) – Ponderosa Pine to Colwick Hill
Improvements on Harrisburg Road between Ponderosa Pine Lane and Colwick Hill Road, including a pedestrian hybrid beacon in between Denbur Drive and Cedarbrook Drive to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, sidewalk, drainage, mid-block pedestrian crossing, curb and gutter, and milling and overlay of asphalt.
Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Timbertop Ln
Improvements on Harrisburg Rd starting near Robinson Church Road and extending to Timbertop Lane to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.
CTC Drainage Repairs
The Charlotte Area Transit System (CATS) anticipates soliciting for the repair of a damaged storm drain pipe along 4th Street in order to improve drainage at the Charlotte Transportation Center.
PSR # 1955
Freeland Drainage Remediation Project
The Charlotte Area Transit System (CATS) Development division anticipates contracting out drainage improvements at the South Boulevard grade crossing near the Freeland intersection.
PSR # 1942
Archdale Station Spalling Concrete Repair- Blue Line
The Charlotte Area Transit System (CATS) Development division anticipates contracting out repairs to spalling on the east face of the pedestrian platform at Archdale Station. Repairs will involve cutting and removing damaged concrete sections using wall sawing and core drilling methods. Carolina Cutting and Coring, the contractor for this work, will perform preparatory drilling, concrete removal, and site cleanup to restore the platform’s integrity.
PSR # 1940
CMGC – ADA Ph 2 – CMaR – Contractor Pre-Qualification
Char-Meck Gov’t Center is identified in the City-wide ADA Transition Plan for Program Implementation. Project scope includes removing physical barriers identified in the ADA Transition Plan in conformance with code as applicable. Project Delivery for Phase 2 is Construction Manager at Risk (CMaR). Vendors will be encouraged to look for contractor pre-qualification notices from our CMaR, JE Dunn Construction Company in 2026. Scope includes Plaza Deck, 1st Floor Lobby, Mezz Level, Highrise and the adjacent parking deck.