CANCEL – This project changed to a phased project with a different title. It was advertised last year under a different name.
This project consists of the design and construction of 22,100 linear feet (LF) of 54″”-84″” pipe to upsize the current Mallard Creek Trunk Sewer line.
This study is necessary to increase treatment capacity of the Mallard Creek Wastewater Treatment Plant to 16 million gallons per day (MGD).
This project consists of improvements to the solids screenings, primary sludge pumping, sludge heating, solids conveyance, secondary digester mixing, and polymer system upgrades.
The first project site is the Mallard Creek Water Reclamation Facility located at 12400 US 29 HWY, Charlotte, North Carolina 28262. The scope of work for this project is a new standby generator facility, the conversion of the existing utility service from 480V to 4160V, electrical upgrades to the existing blower building and the replacement of an existing electrical switchboard. The second project is the Lee S Dukes Water Treatment Plant located at 7980 Babe Stillwell Road, Huntersville, North Carolina 28078. The scope of work for this project is a new standby generator facility, the replacement of the existing 4kV switchgear and 4kV electrical duct bank to re-feed the existing transformers.
Contract to plan and design ped bridge over I-277
Storm Drainage Improvement Project
Install fall protection on roof
The project will cover aerial imagery and base mapping, maintain/replace survey equipment, easement mapping trimble licenses, and ESRI licenses.
“construction contract for sidewalk project sidewalk along Bryant Farms Road between Hawk Ridge Elementary School and Elm Lane. The total project length is approx. 1.02 miles
“