Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.

Collective Series J Storm Drain Improvement Project

The Collective Storm Drainage Improvement Project (SDIP) Series J contains three separate projects which vary in size and each bring their unique differences. The work involves various storm drainage improvements including replacement of storm drainage pipes, culvert, masonry drainage structures, water line, sewer line, asphalt pavement, concrete driveways, concrete sidewalk and concrete curb. These improvements will realign storm drainage to reduce structure flooding and address failing infrastructure. Due to the complexity of these projects and their proximity to utility poles/structures/retaining walls, active shoring will be required.

On-Call Landscaping Services (Cancel)

Landscaping services for the airport to include but not limited to edge-line clearing, small scale tree trimming, full clearing of wooded areas, heavy equipment for brush mow work, road shoulder clearing with tree removal, slope clearing, soil and seeding work,

Landscape Services are broken into zones.  Zones have been advertised.

Landscape Maintenance Zone 3

The Charlotte Douglas International Airport (CLT) seeks to award a contract for Landscaping Maintenance Services of common areas including facilities, roadways, field & drainage areas and inclusive of turf, shrubs, ground cover and trees, mulching, fall over seeding, bedding areas, annual color, trash control, and chemical application. Zone 3 is primarily roadway moving with limited bedding areas.

All work must meet accepted standards as set forth in industry documents and this scope of services. The Contractor must be able to perform the majority of work each weekday (Monday – Friday) with litter control occurring each day of the week including weekends. Work may on occasion be required on Saturday or at night to accommodate traffic and safety concerns upon the
site.

Work is divided between regular maintenance which is performed daily or weekly and yearly maintenance listed as annual for work that occurs an average of one each year. The Contractor shall furnish all material, labor, tools, supplies, equipment, transportation, superintendence, insurance, taxes, contributions and all services and facilities unless specifically excepted, required to maintain the property

Zone 4 Field Operations Center (Construction Manager-at-Risk)

The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays.  The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.

Rodgers Builders was selected as the Construction Manager at Risk (CMAR)  for this project.

 

Pleasant Grove Road Sidewalk- Cancelled

This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School.   This project has been cancelled.

Shade Valley Realignment Project

Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.

Oakhurst/ Amity Gardens Multi-Use Path (Landscaping) CANCELLED

Landscaping (trees and shrubs) for a 12 ft. concrete multi-use path between the Oakhurst and Amity Gardens neighborhoods. The path itself contains two pedestrian bridges, lighting, trash receptacles, two retaining walls, handrails, benches, and dog waste stations.

Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.