This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion at the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
Monroe Road Streetscape
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.
Tuckaseegee Rd (Little Rock Rd to Westerwood Dr) Sidewalk
This project will fill in gaps in the existing sidewalk system on the south side along Tuckaseegee Road from Little Rock Road to West Mecklenburg High School, and along the north side of Tuckaseegee Road from Burkholder Road to Toddville Road.
Idlewild Road/Rama Road/Monroe Road Intersection
This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.
Airport Tree Clearing
As part of the 4th Parallel Runway project, the Airport will solicit bids for tree clearing, erosion and sediment control. While the final bid package will contain exact line items, it is anticipated for the tree clearing to be roughly 160 acres. The tree clearing will consist of setting perimeter erosion control measures, cutting and hauling off of timber, but will not include any grubbing, clearing or grading.
Specialized Roadway Construction Services FY23A
This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.
Specialized Roadway Construction Services FY23B
This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.
Piccadilly Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Farmer Street/Romare Bearden Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is bordered by West Boulevard to the north, Farmer Street the south, Clanton Road to the east and Ross Avenue to the west. The drainage system consists of closed corrugated metal pipe systems underneath City maintained roads. Approximately 3,200 linear feet of 60-inch deteriorated corrugated metal pipe will need to be replaced.