This project will improve the pedestrian and bicycle facilities on Sunset Road from Day Lilly Lane to Beatties Ford Road. Project length is approximately 2.12 miles. The work includes construction of concrete sidewalk, curb & gutter, curb ramps and driveways, drainage, grading, erosion control, traffic control, asphalt pavement, pavement markings and water & sanitary sewer improvements.
Prosperity Church Road (Old Ridge to Benfield) Improvements
The project proposes to widen Prosperity Church Rd approximately 0.3 mi between Old Ridge Rd and Benfield Rd to provide curb and gutter, sidewalk, storm drainage, bicycle lanes, and on-street parking, as well as a roundabout at Prosperity Church Rd and Prosperity Ridge Rd.
Sugar Creek Wastewater Treatment Plant Alkalinity Storage Replacement
This project includes the removal of two high-density polyethene chemical storage tanks and mixers, the construction of a new chemical storage tank containment area, the installation of three new chemical storage tanks (two in the existing containment area and one in the new containment area), installation of a chemical mixer at each tank, installation of a new chemical metering pump in the new containment area, construction of an enclosed pump room within the containment areas, installation of new and replacement of piping, and construction of a canopy over the new containment area.
Storm Water Repair and Improvement FY2023-C
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve: mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.
Brown Grier Road Upgrades
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.
Beatties Ford Rd (LaSalle- Oaklawn) Sidewalks Ph. 1
This project will add sidewalks and amenities along Beatties Ford Rd between LaSalle St and Oaklawn Ave.
Morris Field Bridge Replacement
This project will replace the bridge on Morris Field Drive between Wilkinson Boulevard and Golf Acres Drive, over the Norfolk Southern Railroad.
University Research Park Sidewalk
This project will install sidewalk and multi-use paths in three locations within the University Research Park area. Locations will include a 6′ concrete sidewalk along Medical Plaza Drive between Harris Boulevard and Mallard Creek Road, a 12′ concrete multi-use path from the intersection of David Taylor Drive and Claude Freeman Drive to the intersection of Governor Hunt Road and David Taylor Drive and a 12′ concrete multi-use path along Claude Freeman Drive from the intersection of David Taylor Drive and Claude Freeman Drive to the first business entrance at the Left side of Claude Freeman Drive. (10330 David Taylor Dr). This project will also install curb ramps, retaining wall, curb and gutter, extension of 3 culverts, concrete headwall, pedestrian lighting and related works.
I-85 North Bridge (Rebid)
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion at the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.