Belk Greenway Connector is a cycle track project. This project will involve shifting the medians on McDowell St to make room for the cycle track, replacing noncompliant curb ramps, replacing noncompliant pedestrian signals, transferring signal heads to new mast arms, mill & overlay, pavement markings, sign installation, and the removal of 4 median trees.
Arrowood at Whitehall Commons Intersection
This is an intersection project which will involve installing a new traffic signal with pedestrian signals, widening some of the approaches, replacing all curb ramps, mill & overlay, and pavement markings. The traffic signal will use steel strain poles.
Rea Road Widening (I-485 to Williams Pond Lane)
The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.
University City Blvd Pedestrian Crossings
This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347
7th Street Parallel Bike Routes
This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.
Remount Road and West Boulevard Intersection Improvements
The project consists of intersection improvements at Remount Rd and West Blvd including sidewalks, curb and gutter, decorative concrete surface treatments, bus shelters with amenities, pedestrian-scale lighting, crosswalks, curb ramps, pedestrian crossing signalization, and landscaping.
Traffic Signal Installation and Maintenance
This traffic signal contract will provide resources to install and maintain traffic signals and support infrastructure citywide.
Cross Charlotte Trail (XCLT)− Tryon to Orr
This project will extend the Cross Charlotte Trail main alignment from N. Tryon Street to Orr Road with additional connectors to the surrounding area.
Beatties Ford Sidewalk Phase 1
This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.
 
				 
								 
													