Monroe Road Streetscape

Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center.  Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.

Tuckaseegee Rd (Little Rock Rd to Westerwood Dr) Sidewalk

This project will fill in gaps in the existing sidewalk system on the south side along Tuckaseegee Road from Little Rock Road to West Mecklenburg High School, and along the north side of Tuckaseegee Road from Burkholder Road to Toddville Road.

Idlewild Road and Monroe Road Intersection

This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.

Specialized Roadway Construction Services FY23A

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Specialized Roadway Construction Services FY23B

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.