Unspecified Traffic Signal Installation and Maintenance FY2023A

The City operates and maintains 775 traffic signals throughout the City of Charlotte and ensures maintenance is performed on all traffic signals every 12 to 18 months. The contracts will provide maintenance of traffic signals for all  traffic signals in the City. Work includes installation and confirming correct operation of all components.

Specialized Roadway Construction Services FY23A

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Specialized Roadway Construction Services FY23B

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

North End Around Taxiway Early Cabling Project has been combine – CANCELLED

One of seven remaining bid packages within the North End Around Taxiway Program. The construction of the NEAT Early Cabling Project provides for temporary direct-buried power cables from the existing power transformer at the existing RW 36C Approach Localizer Emergency Generator to the existing transformer at the existing Runway 18C Approach Glideslope Shelter in locations with minimal impacts from the proposed NEAT 1st Package construction within the NEAT program.

Graham Street Intelligent Transportation System (ITS) Project

This project will install approximately 2.5 miles of 72 count single-mode fiber optic cable installed in mostly existing conduit. There are also small portions of new directionally bored, hand-dug, and trenched conduit. This project includes entrances and communications equipment for six existing traffic signal control cabinets and the installation of seven traffic management cameras. The project limits are North Graham Street beginning at West Sugar Creek Road to Mallard Creek Road to West WT Harris Boulevard. This project includes fiber optic cable splicing, testing, Ethernet equipment communications, and traffic management cameras and equipment.

East Boulevard Intelligent Transportation System (ITS) Project

This project will install approximately 1.53 miles of 36 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for four existing traffic control cabinets and the installation of four traffic management cameras. The project limits are East Boulevard beginning at Queens Road West to Euclid Avenue. This project also includes fiber splicing, testing, Ethernet equipment communications, and traffic management cameras and equipment.

South Tryon St Intelligent Transportation System

This project will install approximately 2.1 miles of 24 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for eight existing traffic control cabinets and the installation of six traffic management cameras. The project limits are S Tryon Street beginning at West Boulevard to Clanton Road and then along Clanton Road to Barringer Drive. This project also includes fiber splicing, testing, Ethernet equipment communications, traffic management cameras and equipment and other related activities.