Charlotte Water, a Department of the City of Charlotte NC, intends to advertise a Request for Proposals (RFP) to contract labor services to deploy an Advanced Metering Infrastructure (AMI) system for all of its approximately 325,000 water meters (collectively, the “Project”). Charlotte Water is issuing a separate RFP for the AMI system hardware and software (the “System”), and Charlotte Water intends to engage in one contract with the successful AMI system proposer. Furthermore, Charlotte Water expects the successful labor services proposer to act as sub-contractor to the successful AMI System proposer under one contract to install the complete AMI System. This will allow Charlotte Water to evaluate Installation Companies separate from AMI systems and make selections of the system and the installer independently while still managing one contract during the implementation phase.
The basic components of the Project sought by Charlotte Water include the following:
- Installation of new meters, retrofit registers (if applicable), and AMI meter interface units (MIUs)
- Handheld devices and software necessary to program and/or initialize the MIUs and collect installation data
- The design, installation, and testing of information interfaces between the AMI system’s software components and Charlotte Water’s customer information system (CIS) and other systems, such as its field work order system
- All related documentation, including technical manuals and operating procedures
- Training of Charlotte Water’s employees in MIU installation
- Managing the inventory of AMI equipment during the course of project deployment
- Satisfactory testing of all software, hardware, and procedures prior to the deployment of the system according to the system testing and acceptance process set forth in the contract
- Coordination, scheduling, communications, and documentation of all installation services
This project will provide new sidewalk along Sardis Road North from Sardis Road to westernmost intersection of Rittenhouse Circle and Sardis Road North. Project length = 0.5 miles.
This project will include the following:
6′ Sidewalk
8′ Planting Strips
2′-6″ Curb and Gutter
Street Trees
Concrete Ped Refuge Island (between Kilcullen Dr. and Rittenhouse Circle)
Concrete Bus waiting pads
Retaining Walls
Curb Ramps
Storm Drainage
This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.
This project will extend the Cross Charlotte Trail main alignment from N. Tryon Street to Orr Road with additional connectors to the surrounding area.
This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.
Project limits are from just south of Evergreen Cemetery Dr to about 400’ south of Central Ave at Kilborne Dr on Norland Rd (0.43 miles). The project includes a shared-use path on one side of the street, storm drainage, water line work, and 2 Rectangular Rapid Flashing Beacons (RRFBs).
This project will provide pedestrian and bicycle facilities on Sunset Road from Day Lilly Lane to Beatties Ford Road.
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.
This project will add sidewalks and amenities along Beatties Ford Rd between LaSalle St and Oaklawn Ave.