ISO Certification Registrar Services

The objective of this Request for Proposals (RFP) is to solicit Proposals that enable the City to determine which ANAB-accredited registrar will best meet the City’s needs to conduct 3rd party audits and issue “Certificates of Registration” in ISO 14001:2015 and ISO 9001:2015 (or the current, approved version of standard).

Multi and Single Family Home Compliance Inspection Services

The Department of Housing & Neighborhood Services’ (HNS), Housing Services Division requires companies to provide residential housing inspection services. The City is looking to contract with one or more companies that perform multifamily rental compliance inspection services on residential structures and single-family home minimum housing code compliance and safety inspections. Companies have the option of submitting a proposal for one type of inspection service or both types of inspection services.

Bus On-Site Inspection

BOD requests a five year service contract for on-site bus inspection.  Specifically, a Contractor is being sought to conduct transit bus line inspection and secondary in-plant quality assurance services. The overall goal for these services is to ensure that each of the vehicles being produced is manufactured in compliance with 49 CFR Part 663, “Pre-Award and Post-Delivery Audits of Rolling Stock Purchases” regulations and 49 CFR 661 “Buy America” requirements; as amended by the “Fixing America’s Surface Transportation” (FAST) Act. These inspections also ensure that the vehicles comply fully with the specifications of the order, and ensure that each vehicle is free from defects.

PSR # 1637

Siphon Pipe Inspection and Cleaning Services – CANCELLED

Charlotte Water will be soliciting proposals from interested companies for siphon pipe inspection and cleaning services. Charlotte Water will be awarding a contract to perform planned siphon pipe inspections and cleaning on a re-occurring maintenance schedule with a standard frequency.

A Charlotte Water representative shall be present when the final cleaning runs are made to ensure cleanliness and will make the final decision on whether the cleaned siphon is acceptable or not. When available, construction drawings of the siphon(s) to be cleaned will be provided.