Perimeter Fence Upgrade Phase II

Phase II of the Perimeter Fence Upgrade project aims to enhance airfield security and safety by mitigating hazards posed by large terrestrial wildlife and preventing unauthorized access to the airfield. This phase includes the replacement of approximately 21,000 linear feet of perimeter fencing along Runway 18R/36L, as well as upgrades to select airfield gates. The project will increase the fence height from 6 feet to 10 feet and implement targeted gate modifications to align with FAA Cert Alert 16-03 and the Airport Security Plan (ASP).

Security Equipment and Maintenance Services

The City is seeking a qualified company to provide Security Equipment and Maintenance Services in its facilities, which is critical to protecting public safety infrastructures and prevention of unauthorized individuals. The Company shall provide, install, and/or replace, when defective, security equipment, and provide maintenance and support to new and existing equipment and technology for video surveillance and access management.

Security System Services

Charlotte Water will be seeking a contract with a company to provide security system maintenance and installation services throughout its facilities.  Services will be required daily and as needed, and will include preventative maintenance and equipment installation and repairs.  Equipment includes, but is not limited to, video devices, intercoms, gates, doors, and ancillary parts.