Charlotte Water is soliciting Statement of Qualifications from a qualified engineering firm to provide survey, design, contract administration, and construction management (if necessary) of multiple pipeline replacement projects and other General Services as requested by the City. All work will be located within the Charlotte Water service area. The projects will be assigned to the Engineer during the course of the contract period as they become available. Projects may vary in size, length and scope, and are to be completed according to the individual project schedule.
Mallard Creek NPW/PW System Rehabilitation (Re-bid)
This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories and FRP (fiberglass reinforced plastic) enclosure.
Mallard Creek NPW/PW System Rehabilitation – CANCELLED
This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants, and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories, and FRP (fiberglass reinforced plastic) enclosure.