The McDaniel Ln 6028 project consists of removing and replacing an existing storm drainage network in the Charlotte Hills Mobile Home Park. It currently has a preliminary estimate of 1.2million dollars.
Rhodes SDIP
Rhodes SDIP is a minor bid project that was created to address the service request at 3738 Rhodes and is located on the City project dashboard.
Collective Storm Drainage Improvement Projects Series AJ
Collective Storm Drainage Improvement Projects Series AJ will involve 6 projects throughout the City of Charlotte, 1614 Lombardy Circle, 2033 Teddington Drive, 2316 Kilborne Drive, 10513 Moss Mill Lane, 435 Norwood Drive, and 5447 Kerry Glen Lane. These projects will consist of reinforced concrete pipe replacement and realignment. The project pipe will consist of a range of different sizes from 15 inch to 36 inch as well as some elliptical pipe. These projects will also consist of CIPP liner, storm drainage structure replacement, non-standard endwalls, full depth asphalt, curb and gutter, concrete driveway, foundation assessment, foundation protection, boulder toe, soil lifts, and watermain replacement.
Morning Dale Storm Drainage Improvement Project
The Morning Dale Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 560 acres, the project will replace and/or rehabilitate aging infrastructure and provide adequate drainage system capacity. This project area is bordered by Hinson Drive to the north, Stratfordshire Drive to the south, Tadlock Place to the east and Morning Dale Road to the west.
Dry Detention Water Quality Enhancement Project
The Project consists of retrofitting existing stormwater detention basins including constructing forebays to increase pretreatment of solids and create sheet flow through the basin, removing and replacing of existing turf grass in the bottom of the basins with a hardier herbaceous vegetative mix that provides more treatment, and modification of outlet structures of basins that increase retention time within the basins to increase pollutant removal.
Collective AH (6633 Brookfield Place, 524 Wilby Drive)
524 Wilby Drive: The culvert will be constructed with a headwall and endwall, with the junction box In between. The 24” plastic pipe will be replaced with 24” RCP.
6633 Brookfield Place: 30” RCP from JB 9 to DCB 8 to be replaced with a 36” RCP , and curb to be added along Alexander Road and standard catch basins to be constructed along the curb.
Magnolia/Winthrop Storm Drainage Improvement Project
The Magnolia/Winthrop Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 30 acres, the project will replace aging infrastructure and provide adequate system capacity.
Queens Storm Drainage Improvement Project
The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Queens Storm Drainage Improvement Project (SDIP) area.
The Queens Storm Drainage Improvement Project is bordered by East 4th Street to the north, Baxter Street to the south, Caswell Road to the east and Baldwin Avenue to the west. This project area is within a drainage area of approximately 40 acres and the improvements will include pipe system upgrades and channel improvements.
Eastway Storm Drainage Improvement Project
The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.
The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west. This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.