Westbourne Storm Drainage Improvement Project

The project area covers approximately 20 acres and is roughly bounded by Old Plank Road to the north, Larkhaven Road to the east, Westbourne Drive to the west, and Bellhaven Boulevard to the south. The project includes storm drain improvement including culvert replacements, repair of aging and deteriorating storm drains by way of pipe system upgrades, and channel stabilization improvements. The project also includes water line upgrades and sanitary sewer relocations along with road resurfacing and seeding in affected project areas.

Bonwood Storm Drainage Improvement Project

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Bonwood Storm Drainage Improvement Project (SDIP) area.

The Bonwood SDIP is bordered by Wendover Road to the south, Canterbury Drive to the east and Chadsford Place to the west. This project is within a drainage area of approximately 124 acres and the improvements include paving, curb and gutter, culvert replacements, pipe system lining/repair and upgrades, and minor open channel improvements.

Chatham Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

911 Georgetown Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Beckwith-Meadow Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Cancelled-Replace Keyway/Cores

The purpose is to provide the replacement of the lock Keyway/Cores at CATS facilities and along the alignment. 480 Schlage Large Format Interchangeable Cores and 1200 Schlage Padlock KS43 will be purchased.

 

 

PSR-879

2831 Flintridge Drive Storm Drainage Improvement Project

The 2831 Flintridge Drive Project will include the replacement of approximately 340LF of 48″ CMP with new 7’x3′ RCBC between open drainage channels behind 2831 and 2816 Flintridge Drive. The 7’x3′ RCBC installation will vary between 9-14 feet deep and will require active shoring approved by a professional engineer.