Firehouse #30 Replacement

Firehouse #30, currently located at 4707 Belle-Oaks Drive, near Charlotte Douglas Airport, is currently located in a house built in 1955 and needs extensive renovations. The facility is the only firehouse where crews must leave their living quarters to access their apparatus, as a result, in impacting response time.

Firehouse #30 design services with the use of Advance Planning funds will be utilized to build a replacement 3-bay 2-story firehouse to manage response volumes in the Beam Road/Airport area. The new facility will be approximately 14,000 square feet. The building will be located at 3019 Beam Road, directly across from the Police and Fire Academy, and the parcel ID number is 141-24-104. It is located in Council District 3. The firehouse design will be the same floor plan design as Hidden Valley Firehouse #45 (HVFH#45).  This project is also designated to be an all-electric firehouse and additional scope will be added.

Carolina Aviation Museum Hangar Restoration – CANCELLED

This project’s purpose is to provide a ‘shell restoration’ of the Historic 1938 Aircraft Hangar located on CLT property and will include adaptive reuse of the hangar to maintain the local historic designation and bring the structure up to code making it shell space ready for future interior upfit.

Hidden Valley Firehouse #45

Design and construct a new 2-story, 3-bay firehouse at 14,626 square feet, to be located at 5800 North Tryon Street. This facility will be a new infill firehouse that will alleviate high call volume for surrounding firehouses. A new firehouse must be built when a new “point of dispatch” is required in order to meet response time standards.  The proposed facility will be located on a 2.03-acre parcel that facilitates the redevelopment of abandoned/underutilized sites and vacant sites. This location and site selection shall meet the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

This project will pursue LEED certification. The site will incorporate solar panels and a geothermal well system with water source heat pumps.

Zone 4 Field Operations Center (Construction Manager-at-Risk)

The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays.  The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.

Rodgers Builders was selected as the Construction Manager at Risk (CMAR)  for this project.

 

Catawba Pump Station Rehabilitation Project

The Project site is the Catawba Raw Water Pump Station located on Mountain Island Lake, owned & operated by Charlotte Water. The site address is 12548 Pump Station Rd, Charlotte, NC 28216. The work under this project will be primarily in Cells #2 & 3. The electrical work consists of changing the Cell #3 voltage from 2300V to 4160V, including new switchgear, synchronous motor, conduit, cable, etc. as well as re-winding an existing electric pump motor. The civil/mechanical work consists of rebuilding/replacing screens, rehabbing cone valves, and installing a new flow meter vault. The structural work consists of new electrical vault, drywall electrical room, masonry, doors, windows, louvers, and fans. This project also includes upgrades to the fire alarm system for the entire Catawba Pump Station facility.

State St. Ped Improvement

This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, street resurfacing, and traffic calming bulb outs with small maturing trees in key locations.The project length is 0.468 Miles.