On-Call Plumbing Services

Charlotte Water is seeking proposals to provide commercial plumbing services on an on-call basis at various locations as directed by the Project Manager.  The Company shall be available 24 hours per day, 7 days per week, 365 days per year to complete any requested services by Charlotte Water.  The Company shall respond to emergency calls for service within 2 hours.  Services include all labor, materials, equipment, and supervision for the plumbing projects.

Firehouse 44

Firehouse 44 will be an integral asset to support Charlotte Fire Department’s efficient response to emergencies in the community; providing a location within the newly developed River District community and expanding their response area in this newly incorporated region of Charlotte. This 14,600 SF, two-story, 3-bay facility will be the first mass timber firehouse in the Southeast US and will meet Living Future’s (LF) Zero Carbon certification for total project embodied carbon. The project will comply with Charlotte’s Sustainable Facilities Policy and fully support the sophisticated and time-sensitive operations of the Fire Department.

Commercial and Private Plumbing Services

Charlotte Water is seeking proposals for Company(ies) to provide Plumbing Services for private property owners and commercial owners who are rate payers. Occasionally there is a need for a Company to provide plumbing service on or prior to a Charlotte Water construction project.

River District Firehouse – Phase 1

Scope Statement: CFD plans to build a temporary firehouse for the newly developed River District to manage response volumes in the area. The firehouse will be located on Dixie River Road, near the future Catawba Crossing, on parcel number 14128101.

The Phase 1 facility will be (1) triple wide trailer to house the firemen and a pre-engineered building to serve as an apparatus bay to house the fire engine and emergency equipment.

This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

Firehouse # 46 Infill Station at Miranda Road

A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

Wharton-Smith has been awarded CMAR services and is working on prequalifying subcontractors for the project.

Miranda Road Firehouse 46

A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

Charlotte Fire Station #2 – Addition and Renovations

The work consists of the addition and renovation of an existing fire station. The locker and restroom facilities will be renovated and expanded. Accessibility improvements are planned in various areas throughout the building and site.

Aircraft Rescue and Firefighting Facility (ARFF)

This Request for Qualifications (RFQ) is issued by the City of Charlotte (“City”), the owner and operator of Charlotte Douglas International Airport (the “Airport” or “CLT”) to acquire the services of a Construction Manager at Risk (“Firm”) for a new Aircraft Rescue Fire Fighting (“ARFF”) Station 47 (the “Project”). The Guaranteed Maximum Price (“GMP”) estimate for the project is $26,000,000. The City is accepting Statements of Qualifications (“SOQ” or “Proposal”) from Firms (or multiple Firms comprising a “Project Team”) whose combination of experience and personnel will provide timely and effective construction management services to the City for this Project.

Old City Hall – ADA Implementation

This solicitation will be used for addressing the physical barriers identified in the city’s ADA Transition Plan. Areas include but are not limited to; restrooms, water fountains, signage, handrails/guardrails, doors & hardware, main lobby service area, exterior sidewalks, parking, and striping.