This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.
Specialized Roadway Construction Services FY23B
This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.
Piccadilly Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Collective R Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
Rounding Run Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Collective P Storm Drainage Improvement Project
The work involves various storm drainage improvements including the replacement of storm drainage pipes, curb & gutter, storm drainage structures, retaining walls, water and sewer (relocations, installations, and adjustments), and asphalt pavement. Stormwater maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.
Collective Storm Drainage Improvement Project – Series N
The project consists of two separate projects within close proximity. 6101
Hickory Forest Drive will include replacing the existing drainage system from
Endhaven Lane to Hickory Forest Drive. 6114 Hickory Forest Drive will include
the removal of existing pipe and backyard structure.
Riverbend Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is bordered by Ashton Drive to the north, Sharon Road to the south and east, and Park Road to the west. The existing drainage system consists of open channel and closed concrete and metal pipe systems.