This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion a the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
Monroe Road Streetscape
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.
Tuckaseegee Rd (Little Rock Rd to Westerwood Dr) Sidewalk
This project will fill in gaps in the existing sidewalk system on the south side along Tuckaseegee Road from Little Rock Road to West Mecklenburg High School, and along the north side of Tuckaseegee Road from Burkholder Road to Toddville Road.
Idlewild Road/Rama Road/Monroe Road Intersection
This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.
Specialized Roadway Construction Services FY23A
This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.
Specialized Roadway Construction Services FY23B
This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.
Fiscal Year 22 Water Main Rehabilitation
This project will clean and apply a polymer coating to the interior walls of old, but still structurally sound cast iron water mains. Also included is the replacement of all valves, hydrants, and galvanized service lines associated with each project. The work completed in this contract will improve water quality and flow in the distribution system; consists of an undetermined number of individual projects consisting of water infrastructure rehabilitation; and/or replacements, which will be assigned by the Project Engineer.
Queens Road West Water Pipe Replacement Project
Charlotte Water (CLTWater) is planning to replace water services on Queens Road West between East Boulevard and Selwyn Avenue and water pipes under Queens Road West from Wellesley Avenue to Selwyn Avenue and East Boulevard near Queens Road West. The Queens Water Main Replacement Project’s completed design and construction have not been scheduled yet.