This project includes safety improvements at 8 sites, focusing on low-cost, high-impact measures such as pedestrian crossings, accessible pedestrian signals (APS), leading pedestrian intervals (LPIs), and priority projects from a Safe Routes to School study.
CMGC- ADA Implementation – Ph 2 – Highrise & Parking Deck
This project will address the non-conforming, physical ADA barriers to the greatest extent feasible and where applicable under code provisions. Phase 2 includes the Charlotte-Mecklenburg Government Center and adjacent Parking Garage. Scope areas include Exterior Plaza, Entrance Lobby, 2nd Floor Mezzanine and the 15-story Highrise. Specific scope includes, but is not limited to, Partitions, Doors and Door Hardware, Ramps, Millwork, Restrooms, Controlled Access, Obstructions, Plaza Deck and Accessible Routes. The project delivery method is Construction Manager at Risk (CMAR). The CMAR will commence with CBI outreach ~3rd qtr 2025 and trade partner pre-qualification ~4th qtr 2025.
Bryant Farms Phase 2 (Progressive Design-Build)
This purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.
Interested? Learn more at our Industry Day Event on 11/17!
For additional information about the Draft RFP and to view the sign in sheet from the industry day, please see the links below. Please note
- Sign-In Sheet (compressed to 2.5MB):
- RFP (compressed to 28MB – due to large file size please allow additional time to load):
Please have all questions submitted by 5pm on Monday December 8, 2025 to Carlos Alzate (Carlos.Alzate@charlottenc.gov)
McCullough Drive Extension
An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles
Fiscal Year 2026 Street Main Extensions Contract 3
This contract will focus on the construction of street main extensions and other necessary infrastructure projects. It will also serve as an on-call contract for capital project construction support. The work will be performed throughout Charlotte Water’s service area, ensuring continued system reliability and expansion where needed.
Fiscal Year 2026 Street Main Extensions Contract 2
This contract will include the construction of street main extensions and various infrastructure projects. The contract will provide construction assistance for other capital projects as needed. It covers the entire Charlotte Water service area, ensuring water distribution system improvements.
Fiscal Year 2026 Street Main Extensions Contract 1
This contract includes the construction of multiple street main extensions and other miscellaneous infrastructure projects. It will provide construction assistance on an as-needed basis for other capital projects. The scope covers the entire Charlotte Water service area, ensuring water distribution system improvements where necessary.
McAlpine Wastewater Management Facility Biosolids Treatment Facilities Reliability – Construction Package 1
Construction Package 1 includes mechanical, electrical, instrumentation, and structural rehabilitation of Digested Sludge Storage Tanks 1 and 2 and their Control Building. The project aims to improve the reliability and performance of biosolids treatment processes. These upgrades will ensure continued compliance with regulatory requirements and operational efficiency.
Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)
This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.