Install decorative crosswalks (interconnected preformed thermoplastic), milling and resurfacing, and pavement markings.
7th Street Parallel Bike Routes
This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.
Remount Road and West Boulevard Intersection Improvements
The project consists of intersection improvements at Remount Rd and West Blvd including sidewalks, curb and gutter, decorative pavers, bus shelters with amenities, pedestrian-scale lighting, crosswalks, curb ramps, pedestrian crossing signalization, and landscaping.
Sharon Road at Eastburn Road Improvements
This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.
Cross Charlotte Trail (XCLT)− Matheson to Craighead
The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.
Cross Charlotte Trail (XCLT)− Tryon to Orr
This project will extend the Cross Charlotte Trail main alignment from N. Tryon Street to Orr Road with additional connectors to the surrounding area.
Storm Water Repair and Improvement FY2024-A
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.
Beatties Ford Sidewalk Phase 1
This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.
Firehouse #30 Replacement
Firehouse #30, currently located at 4707 Belle-Oaks Drive, near Charlotte Douglas Airport, is currently located in a house built in 1955 and needs extensive renovations. The facility is the only firehouse where crews must leave their living quarters to access their apparatus, as a result, in impacting response time.
Firehouse #30 design services with the use of Advance Planning funds will be utilized to build a replacement 3-bay 2-story firehouse to manage response volumes in the Beam Road/Airport area. The new facility will be approximately 14,000 square feet. The building will be located at 3019 Beam Road, directly across from the Police and Fire Academy, and the parcel ID number is 141-24-104. It is located in Council District 3. The firehouse design will be the same floor plan design as Hidden Valley Firehouse #45 (HVFH#45). This project is also designated to be an all-electric firehouse and additional scope will be added.