Unspecified Water and Sewer Repairs

This contract covers on-call repairs for water and sewer systems throughout Charlotte Water’s collection and distribution areas. Work may include emergency mobilization for critical pipeline repairs and other maintenance activities. The contract ensures rapid response capabilities for unforeseen infrastructure issues.

McAlpine Creek WWMF Nutrient Harvesting

While nutrient harvesting has not yet been implemented by CLTWater at any  of its wastewater treatment facilities, CLTWater strives to promote beneficial reuse at the McAlpine Creek WWMF and across its other wastewater treatment facilities.  To maximize economies of scale, a nutrient harvesting facility (Facility) at the McAlpine Creek WWMF would create the highest current and future value proposition for CLTWater and the treatment plant network.  Currently, primary sludge (PS) and waste activated sludge (WAS) from two of the five wastewater treatment facilities are processed at McAlpine Creek WWMF.

In the future, PS and WAS from four of six wastewater treatment facilities will be processed at the McAlpine Creek WWMF.  Dewatering centrate is high strength waste typically recycled within the treatment plant for processing.  Implementation of a Facility would allow CLTWater to create a product that can be beneficially reused (i.e., product to be bagged or bulk shipped and sold) and gain some treatment capacity at the McAlpine Creek WWMF. Designing, constructing, and operating the Facility at the McAlpine Creek WWMF is one component of implementing the overall CLTWater nutrient management and biosolids diversification strategy.

Wilkinson Boulevard ITS Phase 2 – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Graham Street Extension Intelligent Transportation Systems

This project will install single‐mode fiber optic cable in existing conduits. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Sardis Road Intelligent Transportation System (ITS) – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

West Boulevard ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Sugar Creek Road ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

McAlpine Large Diameter Sewer Rehabilitation – Phase 2

This project involves the rehabilitation of approximately 7,000 linear feet of reinforced concrete pipe (RCP) sewer outfall. The sewer outfall is located just south of Highway 51, running parallel to McAlpine Creek. The work will improve the structural integrity and performance of the sewer system.