Firehouse #30 Replacement

Firehouse #30, currently located at 4707 Belle-Oaks Drive, near Charlotte Douglas Airport, is currently located in a house built in 1955 and needs extensive renovations. The facility is the only firehouse where crews must leave their living quarters to access their apparatus, as a result, in impacting response time.

Firehouse #30 design services with the use of Advance Planning funds will be utilized to build a replacement 3-bay 2-story firehouse to manage response volumes in the Beam Road/Airport area. The new facility will be approximately 14,000 square feet. The building will be located at 3019 Beam Road, directly across from the Police and Fire Academy, and the parcel ID number is 141-24-104. It is located in Council District 3. The firehouse design will be the same floor plan design as Hidden Valley Firehouse #45 (HVFH#45).  This project is also designated to be an all-electric firehouse and additional scope will be added.

On Call Stream Restoration and Sanitary Sewer Repair

This project includes stream stabilization and sewer repair at multiple locations within the sanitary sewer collection system. Stream stabilization structures shall be constructed to protect existing and proposed sanitary sewer infrastructure.

Project components include natural in-stream structures, plantings, site grading, sanitary sewer replacement, sheet pile installation, bypass pumping and sediment control measures. Site locations will be released during the contract duration.

The contract is expected to be for a two-year term with possible renewal.

Vest Water Treatment Plant to Franklin Water Treatment Plant Force Main and Lee Duke Water Treatment Plant Chem Feed Improvements

 The Project consists of two scopes of work.

Scope 1: Vest Water Treatment Plant to Franklin Water Treatment Plant Force Main consists of installing over 16,000 linear feet of 16” ductile iron piping force main for residual and backwash transfer between the Vest Water Treatment Plant and the Franklin Water Treatment Plant. Installation of all associated fittings, valves, air release valves, trenching, trenchless crossings, parallel future piping, paving, connections, corrosion control, erosion control, cleaning, testing, and all other associated pipeline work. Installation of two crossings at CSX railroad and NCDOT I-85 Interstate, consisting of parallel 16” ductile iron carrier pipe inside single casing. Reporting on material of service connections along alignment and replacing galvanized steel service lines where discovered.

Scope 2: Lee S Dukes High Density Polyethylene (HDPE) Pipeline consists of the installation of 6,000 LF of new 3-inch x 6-inch diameter double wall containment pipe for new chlorine dioxide chemical feed system, including all appurtenances, leak detection system, electrical, testing, and final commissioning. Installation of two (2) new 2-inch diameter HDPE raw water sample lines (approximate length is 6,000 LF for each), including all appurtenances, and testing. Installation of a new raw water sample pump, casing, piping, appurtenances, electrical, and testing at the Raw Water Intake at Blythe Landing. Removal and replacement of various chemical feed lines (11/2-inch and 4-inch diameter) inside existing 8-inch and 12-inch diameter casing pipes. Installation of new fiber optic cable (approximately 6,000 LF) between the Lee S. Dukes WTP and the Raw Water Intake. Installation of new potable water line from Highway 73 to existing Compressor Building, including all appurtenances, and testing.

FY23 Water and Sewer Infrastructure – Contract 1

This contract will provide for new water and sanitary sewer main construction throughout the Charlotte, NC water service area. The majority of this contract will be used to build projects for the Street Main Extension Program.

Briar Creek and Paw Creek Sewer Rehabilitation

This project consists of the sanitary sewer rehabilitation of approximately 13,500 linear feet of sewer outfall with cured-in-place lining. This project will extend along the Briar Creek and Paw Creek outfalls.  A 112 linear feet 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 linear feet 8-inch linear feet collector sewer.

FY23 Large Diameter/Sewer Service Contract #1 (Re-bid)

This contract will incorporate the installation of water and/or sanitary sewer services at a single address, water and/or sanitary sewer service dismantlement at a single address or a water/sanitary sewer main line extension. There maybe more than one water and/or sanitary sewer service installation , water and/or sanitary sewer service dismantlement at the same address. Additionally, a single commercial site with water and/or sanitary sewer services to be installed or water and/or sanitary sewer services to be dismantled at different addresses is to be considered one project for the entire commercial site.

FY23 Large Diameter/Sewer Service Contract #1

This contract will incorporate the installation of water and/or sanitary sewer services at a single address, water and/or sanitary sewer service dismantlement at a single address or a water/sanitary sewer main line extension. There maybe more than one water and/or sanitary sewer service installation , water and/or sanitary sewer service dismantlement at the same address. Additionally, a single commercial site with water and/or sanitary sewer services to be installed or water and/or sanitary sewer services to be dismantled at different addresses is to be considered one project for the entire commercial site.

 

Goose Creek Sanitary Sewer to Cresthill

Project site is mainly wooded and has minimal housing. There will be one crossing on Lawyers Rd. The project will consist of approximately 5,500 linear feet of 8-inch gravity sewer.

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)-DUPLICATE

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove and replace existing copper and fiber communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.