Storm Water Repair and Improvement FY2026-D (Various Locations)

Work performed under this contract will consist of nine (9) storm drainage improvement projects (point repair) throughout Charlotte, NC as illustrated in the plans of the contract documents. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the respective project plan.

Firehouse 44

Firehouse 44 will be an integral asset to support Charlotte Fire Department’s efficient response to emergencies in the community; providing a location within the newly developed River District community and expanding their response area in this newly incorporated region of Charlotte. This 14,600 SF, two-story, 3-bay facility will be the first mass timber firehouse in the Southeast US and will meet Living Future’s (LF) Zero Carbon certification for total project embodied carbon. The project will comply with Charlotte’s Sustainable Facilities Policy and fully support the sophisticated and time-sensitive operations of the Fire Department.

Safe Streets for All (SS4A) – Phase 1

This project includes safety improvements at 8 sites, focusing on low-cost, high-impact measures such as pedestrian crossings, accessible pedestrian signals (APS), leading pedestrian intervals (LPIs), and priority projects from a Safe Routes to School study.

CMGC- ADA Implementation – Ph 2 – Highrise & Parking Deck

This project will address the non-conforming, physical ADA barriers to the greatest extent feasible and where applicable under code provisions. Phase 2 includes the Charlotte-Mecklenburg Government Center and adjacent Parking Garage.  Scope areas include Exterior Plaza, Entrance Lobby, 2nd Floor Mezzanine and the 15-story Highrise. Specific scope includes, but is not limited to, Partitions, Doors and Door Hardware, Ramps, Millwork, Restrooms, Controlled Access, Obstructions, Plaza Deck and Accessible Routes. The project delivery method is Construction Manager at Risk (CMAR).  The CMAR will commence with CBI outreach ~3rd qtr 2025 and trade partner pre-qualification ~4th qtr 2025.

Bryant Farms Phase 2 (Design-Build)

This purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.

McCullough Drive Extension

An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles

Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.

WT Harris SUP (JW Clay to N Tryon)

A 12’ wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path.  Project Length = 0.33 miles.

Old Concord Road Shared-Use Path (Meadow Vista to Arlyn Cir)

This project will construct a shared-use path along the west side of Old Concord Road from Meadow Vista Road to Arlyn Circle. Construction of driveway improvements and wheelchair ramps are included in this scope. The construction of the shared-use path will help to improve safety and walking conditions for citizens along this minor thoroughfare. This project will also connect several miles of pedestrian walkways within this area. Old Concord Road Shared-Use Path is considered a high priority project based on CDOT’s sidewalk Priority list and was requested by the residents and business owners in the area. Improvements for Charlotte Water are also included in the project scope. Project Length= .85 miles.