FY23 Professional Engineering and Land Survey Services for Watermain and Sanitary Sewer Street Main Design/Extensions Contract #2 – CANCELLED

This contract is for professional services in support of the Design and Construction Division. These contracts will allow Design and Construction to assist with LCR projects which typically require a longer and more complicated design process which in turn is more costly. Examples of reasons for increased cost in LCR projects versus typical street main extensions would be the need for geotechnical investigation or wetlands investigation and permitting.

Carolina Aviation Museum Hangar Restoration – CANCELLED

This project’s purpose is to provide a ‘shell restoration’ of the Historic 1938 Aircraft Hangar located on CLT property and will include adaptive reuse of the hangar to maintain the local historic designation and bring the structure up to code making it shell space ready for future interior upfit.

Carolina Aviation Museum Sitework

This project consists of site preparation for the future development of the Carolinas Aviation Museum. Specific work includes demolition of existing facilities, earthwork, grading, utility installation, associated asphalt, concrete masonry work, landscaping, and other miscellaneous items.

Birmingham 6317 Storm Drain Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Ideal Way 816 Storm Drain Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Foxwood Road 2727 Storm Drain Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Barrington Drive 5919 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Collective M (Sharon Hills)

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 7 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after review is complete.

Collective L (Knightwood, Fair Valley) Storm Drain Improvement Project

The purpose and need for this construction project are to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 2 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after the review is complete.