9832 Grasmere Dr

The scope of this project will be the installation of approximately 160 LF of concrete block retaining wall to address severe bank erosion.

IRIS DRIVE STORM DRAINAGE IMPROVEMENT PROJECT

The Iris Drive Storm Drainage Improvement Project involves removal of existing retaining wall and installation of erosion control measures; installation of a new retaining wall; milling, resurfacing, and restriping of existing parking lot; installation of wheelstops and installation of curb; installation of a stormwater manhole, catch basin, and associated pipe. Stream improvements include addition a boulder toe, rock sills, and plantings along portions of the stream. The estimated cost of this project is $ 521,500.00.

FY26 Water and Sewer Repairs — CANCELLED

This Project includes the repair of water and sewer main lines and service lines throughout the Charlotte Water service area. The work under this contract
will supplement the City’s workforce in making both routine repairs and more urgent repairs when damage is done by other parties. Work may include either water or sewer lines, any depth or any size. Because of the unknown scope of each repair, this is a Time and Materials contract.

Gleneagles SDIP

The Gleneagles Project is primarily focused on replacing an existing CMP culvert near 3810 Gleneagles Road.  The existing culvert is 8.7’ high by 7.8’ wide and is being replaced with a 10’ wide and 7’ tall RCBC.  The culvert replacement is occurring to address aging infrastructure and to improve the reliability of infrastructure for the traveling public.  In support of this culvert replacement, we are dredging the downstream pond which is located on the Quail Hollow Country Club near the 15th hole.  The dredging will remove sediment that has built up near the downstream end of the existing culvert and prevent sediment transport downstream which would negatively impact existing ponds and habitats.  In addition, we will be adding inlets and upgrading roadside drainage on Out-Of-Bounds Drive which has significant spread in larger storm events from road drainage.  The work on Out-Of-Bounds Drive will increase the safety of the traveling public using that roadway during rain events.

Bruns Academy WQEP

There is an existing wetlands system and stream adjacent to the Bruns Academy that are in need of improvements. The intent of this project is to reset an existing wetlands system to its original design and provide enhancement, where applicable. Wetland restoration efforts will include regrading, sodding and planting of vegetation,  installation of a new pedestrian bridge and retaining wall.  Additionally, stream improvements, such as regrading banks and adding riffles, are proposed. The proposed improvements will enhance the overall performance of the system for conveying and treating stormwater.

Robinson Church Road Widening – Phase 1

Widen Robinson Church Road from WT Harris Blvd. to the Plott Road/Highland Avenue intersection from two lanes to three lanes with intermittent islands. Amenities include: curb & gutter, shared-use path, planting strip, underground stormwater filers, accessible ramps, and mid-block crossings. Includes the construction of a roundabout.

Hastings Princeton SDIP

The Hastings/Princeton Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 80 acres, the project will replace aging infrastructure and provide adequate system capacity. The project area is bordered by Wellesley Avenue to the north, Hastings Drive to the south, Selwyn Avenue to the east and Jamestown Drive to the west.